2013-2015 Land Cruiser Prado · Service Manual Suspension

INSTALLATION

Removal / installation · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. INSTALL NO. 2 HEIGHT CONTROL VALVE SUB-ASSEMBLY
  1. Install the No. 2 height control valve with the 2 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


2. CONNECT HEIGHT CONTROL TUBE
  1. Connect the 3 height control tubes (Click here).

    HINT:
    For the connection procedure of the tubes (type 1 and type 2), refer to Precaution of the Suspension Control System section.

  1. Connect the connector.


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


4. CHECK CONNECTION OF TUBE FOR AIR LEAK
(Click here)
← INSPECTION (from Aug 2013)INSTALLATION (from Aug 2014) →