INSTALLATION
Removal / installation · Vehicles built Aug 2013 – Jul 2014
Versions by build date: Aug 2013 – Jul 2014 from Aug 2014
| 1. INSTALL NO. 2 HEIGHT CONTROL VALVE SUB-ASSEMBLY |
Install the No. 2 height control valve with the 2 bolts.
- Torque:
- 29 N*m{ 296 kgf*cm , 21 ft.*lbf }
| 2. CONNECT HEIGHT CONTROL TUBE |
Connect the 3 height control tubes (Click here).
- HINT:
- For the connection procedure of the tubes (type 1 and type 2), refer to Precaution of the Suspension Control System section.
Connect the connector.
| 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
| 4. CHECK CONNECTION OF TUBE FOR AIR LEAK |
