2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. INSTALL NO. 1 TURBO WATER PIPE SUB-ASSEMBLY
  1. Install a new gasket and the No. 1 turbo water pipe sub-assembly to the turbocharger sub-assembly with the 2 nuts and bolt.

    Torque:
    for bolt:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
    for nut:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }


2. INSTALL COMPRESSOR INLET ELBOW
  1. Type B
    Install the No. 3 turbo water hose to the compressor inlet elbow and slide the clamp to secure the hose.

  1. Type A
    Install the No. 4 turbo water hose to the compressor inlet elbow and slide the clamp to secure the hose.

  1. Install a new gasket and the compressor inlet elbow to the turbocharger sub-assembly with the 2 nuts.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }


3. INSTALL EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY
  1. Temporarily install a new gasket and the turbocharger sub-assembly with 3 new nuts to the exhaust manifold.

    HINT:
    It is easier to install the turbo oil inlet pipe sub-assembly if the 3 nuts are only loosely installed.

  1. Set a new gasket on the engine and install the exhaust manifold with turbocharger and the 8 plate washers with 8 new nuts.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }

  1. Temporarily install the turbo oil inlet pipe sub-assembly.

    HINT:
    Before installing the turbo oil inlet pipe sub-assembly, clean it.


    1. Install a new gasket and the turbo oil inlet pipe sub-assembly with the 2 nuts, but only loosely install the nuts.

      NOTICE:
      The notch (narrow part) of the gasket must face the engine.

    2. Install a new gasket and the turbo oil inlet pipe sub-assembly with the 2 bolts, but only loosely install the bolts.

      NOTICE:
      The claws of the gasket must face the pipe.

    3. Install a new gasket and the turbo oil inlet pipe sub-assembly with the union bolt, but only loosely install the union bolt.

      A220732E02

      Text in Illustration 
      *1
      Gasket
      -
      -
      *a
      Wide
      *b
      Narrow
      *c
      Claw
      -
      -
      V100135
      Outside
      -
      -

    4. Temporarily install the turbocharger stay to the turbocharger sub-assembly and cylinder block sub-assembly with the 2 bolts and a new nut.

  1. Tighten the 3 nuts of the turbocharger sub-assembly.

    Torque:
    52 N*m{ 530 kgf*cm , 38 ft.*lbf }

  1. Tighten the 2 nuts labeled A.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Tighten the union bolt labeled B.

    Torque:
    33 N*m{ 337 kgf*cm , 24 ft.*lbf }

  1. Tighten the 2 bolts labeled C.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. A220726E01
    Tighten the 2 bolts and nut of the turbocharger stay in the order shown in the illustration.

    Torque:
    38 N*m{ 387 kgf*cm , 28 ft.*lbf }


4. INSTALL WIRE HARNESS CLAMP BRACKET
  1. Install the wire harness clamp bracket with the bolt.

    Torque:
    51 N*m{ 520 kgf*cm , 38 ft.*lbf }


5. INSTALL NO. 3 TURBO WATER HOSE
  1. Install the No. 3 turbo water hose to the No. 2 water by-pass pipe and slide the clamp to secure the hose.


6. CONNECT NO. 1 TURBO WATER HOSE
  1. Type B
    Connect the No. 3 turbo water hose to the compressor inlet elbow and slide the clamp to secure the hose.

  1. Connect the No. 1 turbo water hose to the No. 2 water by-pass pipe and slide the 2 clamps to secure the hoses.


7. CONNECT ENGINE OIL LEVEL DIPSTICK GUIDE
  1. Connect the engine oil level dipstick guide to the cylinder block sub-assembly.

  1. Install the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


8. TEMPORARILY INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
  1. Temporarily install the No. 1 exhaust manifold heat insulator to the exhaust manifold with the 2 bolts.


9. INSTALL NO. 1 TURBO INSULATOR
  1. Temporarily install the No. 1 turbo insulator to the turbocharger sub-assembly with the 2 bolts.

  1. Tighten the 2 bolts of the No. 1 exhaust manifold heat insulator and the 2 bolts of the No. 1 turbo insulator.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }


10. INSTALL VENTILATION PIPE
  1. Connect the 2 ventilation hoses and install the ventilation pipe to the cylinder head sub-assembly with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Type A
    Connect the No. 3 turbo water hose and No. 4 turbo water hose to the ventilation pipe.


11. INSTALL FUEL PIPE CLAMP
  1. Install the fuel pipe clamp to the turbine outlet elbow with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 in.*lbf }


12. INSTALL TURBINE OUTLET ELBOW
  1. Temporarily install the turbine outlet elbow to the turbocharger sub-assembly with a new gasket and 3 new nuts.

  1. Temporarily install the No. 1 fuel pipe with the 2 bolts.

  1. Temporarily install the No. 1 fuel pipe with a new gasket and the union bolt.

  1. A246259E01
    Tighten the 3 nuts of the turbine outlet elbow.

    Torque:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }

    Text in Illustration 
    *1
    No. 4 Water By-pass Pipe
    *2
    No. 12 Water By-pass Hose
    *3
    Turbine Outlet Elbow
    *4
    Gasket
    *5
    No. 1 Fuel Pipe
    *6
    Union Bolt

  1. Connect the No. 4 water by-pass pipe to the No. 12 water by-pass hose and slide the 2 clamps to secure the hose.

  1. Install a new gasket and the union bolt to the turbine outlet elbow.

    Torque:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }


13. CONNECT NO. 1 FUEL PIPE

  1. A246265E01
    Tighten the 2 bolts and union bolt of the No. 1 fuel pipe in the order shown in the illustration.

    Torque:
    for union bolt:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }
    for bolt:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

    Text in Illustration 
    V100136
    Union Bolt


14. INSTALL NO. 11 WATER BY-PASS HOSE
  1. Install the No. 11 water by-pass hose to the turbine outlet elbow and slide the 2 clamps to secure the hose.

  1. Connect the exhaust fuel addition injector connector.


15. INSTALL NO. 2 TURBINE OUTLET ELBOW
  1. Install a new gasket and the No. 2 turbine outlet elbow to the turbine outlet elbow with 3 new nuts.

    Torque:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }


16. INSTALL TURBINE OUTLET ELBOW STAY
  1. Temporarily install the turbine outlet elbow stay to the No. 2 turbine outlet elbow and cylinder block sub-assembly with the 2 bolts.

  1. A244591E01
    Tighten the 2 bolts of the turbine outlet elbow stay in the order shown in the illustration.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }


17. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
  1. Install the No. 2 exhaust manifold heat insulator to the turbine outlet elbow with the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


18. INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET
  1. Install the No. 1 compressor mounting bracket with the 5 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    HINT:
    Firmly press and hold the No. 1 compressor mounting bracket against the cylinder block to eliminate any gaps. Then uniformly tighten the 5 bolts.


19. INSTALL GENERATOR BRACKET
  1. Install the generator bracket with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


20. INSTALL GENERATOR ASSEMBLY

  1. A222880E01
    Install the generator with the 2 bolts.

    Torque:
    for bolt A:
    62 N*m{ 632 kgf*cm , 46 ft.*lbf }
    for bolt B:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the generator wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cap.

  1. Connect the generator connector.


21. CONNECT COOLER COMPRESSOR ASSEMBLY (w/ Air Conditioning System)
  1. Connect the cooler compressor with the 4 bolts.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }

  1. Connect the compressor connector.


22. INSTALL NO. 1 VISCOUS HEATER BRACKET SUB-ASSEMBLY (for Cold Area Specification Vehicles)
  1. Install the No. 1 viscous heater bracket with the 4 bolts.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }


23. INSTALL VISCOUS WITH MAGNET CLUTCH HEATER ASSEMBLY (for Cold Area Specification Vehicles)
  1. Install the viscous heater with magnet clutch with the 2 bolts.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }

  1. Connect the water by-pass hose and water hose.

  1. Connect the viscous heater connector.


24. INSTALL COMPRESSOR OUTLET ELBOW
  1. Install the compressor outlet elbow with the 2 bolts and tighten the hose clamp.

    Torque:
    for bolt:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }
    for hose clamp:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. Install the wire harness bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Attach the 3 wire harness clamps.


25. INSTALL NO. 1 AIR HOSE

NOTICE:
Before installation, remove any oil residue from the inside of the inlet pipe and intercooler.

  1. A249350E01
    Align the paint mark of the No. 1 air hose with the embossed mark of the intercooler and install the No. 1 air hose.
    Text in Illustration 
    *1
    Embossed Mark
    *2
    Paint Mark
    *a
    Rear Side of Vehicle
    *b
    LH Side
    *c
    Top

  1. Tighten the 2 clamps.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


26. INSTALL HEATER HOSE (w/o Rear Air Conditioning System)

  1. A246264E02
    Install the heater hose to the heater pipe and slide the 2 clamps to secure the hose.
    Text in Illustration 
    *a
    Upper Side
    *b
    Paint Mark

    HINT:
    1. When connecting the hoses, make sure the paint marks and clips are as shown in the illustration.
    2. The direction of each hose clamp is indicated in the illustration.


27. CONNECT HEATER HOSE AND PIPE (w/ Rear Air Conditioning System)

  1. A246263E02
    Install the bolt to the heater hose and pipe.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

    Text in Illustration 
    *a
    Upper Side
    *b
    Paint Mark

  1. Connect the 3 heater hoses to the heater pipe, and slide the 3 clamps to secure the hoses.

    HINT:
    1. When connecting the hoses, make sure the paint marks and clips are as shown in the illustration.
    2. The direction of each hose clamp is indicated in the illustration.


28. INSTALL AIR CLEANER CASE SUB-ASSEMBLY
  1. Install the air cleaner case sub-assembly with the 3 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }


29. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

30. INSTALL AIR CLEANER CAP SUB-ASSEMBLY
  1. Attach the 4 clamps to install the air cleaner cap sub-assembly.

  1. except Cold Area Specification Vehicles:
    Attach the 2 clamps and connect the mass air flow meter connector.

  1. for Cold Area Specification Vehicles:
    Attach the 3 clamps and connect the mass air flow meter connector.


31. INSTALL NO. 1 AIR CLEANER HOSE

  1. Install the No. 1 air cleaner hose with the 2 hose clamps.

    A311923E01

    Text in Illustration 
    *1
    No. 1 Air Cleaner Hose
    *2
    Compressor Inlet Elbow
    *3
    Air Cleaner Cap
    -
    -
    *a
    Upper Side
    *b
    Front Side of Vehicle
    *c
    Protrusion
    *d
    Groove

    NOTICE:
    1. When installing the No. 1 air cleaner hose, align the protrusion of the No. 1 air cleaner hose with the protrusion of the compressor inlet elbow as shown in the illustration.
    2. When installing the No. 1 air cleaner hose, align the groove of the No. 1 air cleaner hose with the protrusion of the air cleaner cap as shown in the illustration.

  1. Tighten the 2 hose clamps.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    NOTICE:
    When tightening the 2 hose clamps, make sure that they are positioned as shown in the illustration.


32. INSTALL FAN AND GENERATOR V BELT

  1. Use the pulley set bolt of the tensioner to rotate the tensioner pulley clockwise, and then install the V belt.

    A223510E01

    Text in Illustration 
    *1
    Crankshaft Pulley
    *2
    Fan Pulley
    *3
    Generator
    *4
    No. 2 Idler Pulley
    *5
    No. 3 Idler Pulley
    *6
    Cooler Compressor
    *7
    Viscous Heater
    -
    -
    *a
    Type A
    *b
    Type C
    *c
    Type B
    *d
    Type D

    NOTICE:
    Make sure that the V belt is set properly on each pulley.

  1. Check that the indicator mark of the V-ribbed belt tensioner (Click here).


33. INSTALL FRONT HEATER BRACKET (for Cold Area Specification Vehicles)

34. INSTALL UPPER RADIATOR SUPPORT SEAL
  1. Install the upper radiator support seal with the 13 clips.


35. INSTALL FRONT NO. 1 FENDER APRON TO FRAME SEAL RH
  1. Install the front No. 1 fender apron to frame seal RH with the 4 clips.


36. INSTALL FRONT FENDER APRON SEAL RH
  1. Install the front fender apron seal RH with the 5 clips.


37. INSTALL FRONT EXHAUST PIPE ASSEMBLY
(Click here)

38. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


39. ADD ENGINE COOLANT
  1. Tighten the radiator drain cock plug by hand.

  1. Tighten the cylinder block drain cock plug.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Fill the radiator with TOYOTA Super Long Life Coolant (SLLC) to the B line of the reservoir tank.

    Standard Capacity:
    Item
    Specified Condition
    for Automatic Transmission
    w/ Rear Heater
    14.9 liters (15.7 US qts, 13.1 Imp. qts)
    w/o Rear Heater
    13.1 liters (13.8 US qts, 11.5 Imp. qts)
    for Manual Transmission
    w/ Rear Heater
    15.0 liters (15.8 US qts, 13.2 Imp. qts)
    w/o Rear Heater
    13.2 liters (13.9 US qts, 11.6 Imp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
    2. Please contact your TOYOTA dealer for further details.
    3. for Cold Area Specification Vehicles:
      Please contact any authorized TOYOTA dealer or repairer or another duly qualified and equipped professional for further details.

    NOTICE:
    Never use water as a substitute for engine coolant.

  1. Press the No. 1 and No. 2 inlet and No. 1 and No. 2 outlet radiator hoses several times by hand, and then check the level of the coolant.
    If the coolant level drops below the B line, add TOYOTA SLLC to the B line.

  1. Install the radiator reservoir cap.

  1. Using a wrench, install the vent plug.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. Bleed air from the cooling system.

    1. Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.

    2. Maintain the engine speed at a speed between 2500 and 3000 rpm.

    3. Press the inlet and outlet radiator hoses several times by hand to bleed air.

      CAUTION:
      When pressing the radiator hoses:
      1. Wear protective gloves.
      2. Be careful as the radiator hoses are hot.
      3. Keep your hands away from the radiator fan.

    4. Stop the engine and wait until the coolant cools down to ambient temperature.

      CAUTION:
      Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. After the coolant cools down, check that the coolant level is at the FULL line.
    If the coolant level is below the FULL line, add TOYOTA SLLC to the FULL line.


40. BLEED AIR FUEL SYSTEM

  1. A223284
    Using the hand pump mounted on the fuel filter cap, bleed air from the fuel system. Continue pumping until the pump resistance increases.

    NOTICE:
    1. The maximum hand pump pumping speed is 2 strokes per second.
    2. The hand pump must be pushed with a full stroke during pumping.
    3. When the fuel pressure at the supply pump inlet port reaches a saturated pressure, the hand pump resistance increases.
    4. If pumping is interrupted during the air bleeding process, fuel in the fuel line may return to the fuel tank. Continue pumping until the hand pump resistance increases.
    5. If the hand pump resistance does not increase despite consecutively pumping 200 times or more, there may be a fuel leak between the fuel tank and fuel filter, the hand pump may be malfunctioning, or the vehicle may have run out of fuel.
    6. If air bleeding using the hand pump is incomplete, the common rail pressure does not rise to the pressure range necessary for normal use and the engine cannot be started.

  1. Check if the engine starts.

    NOTICE:
    1. Even if air bleeding using the hand pump has been completed, the starter may need to be cranked for 10 seconds or more to start the engine.
    2. Do not crank the engine continuously for more than 20 seconds. The battery may be discharged.
    3. Use a fully-charged battery.


    1. When the engine can be started, proceed to the next step.

    2. If the engine cannot be started, bleed air again using the hand pump until the hand pump resistance increases (refer to the procedures above). Then start the engine.

  1. Turn the engine switch off.

  1. Connect the intelligent tester to the DLC3.

  1. Turn the engine switch on (IG) and turn the intelligent tester on.

  1. Clear the DTCs (Click here).

  1. Start the engine.*1

  1. A194065E05
    Enter the following menus: Powertrain / Engine and ECT / Active Test / Test the Fuel Leak.*2
    Text in Illustration 
    *a
    Reference
    (Active Test Operation)

  1. Perform the following test 5 times with on/off intervals of 10 seconds: Active Test / Test the Fuel Leak.*3

  1. Allow the engine to idle for 3 minutes or more after performing the Active Test for the 5th time.

    A192848E04

    HINT:
    When the Active Test "Test the Fuel Leak" is used to change the pump control mode, the actual fuel pressure inside the common rail drops below the target fuel pressure when the Active Test is off, but this is normal and does not indicate a pump malfunction.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

  1. Clear the DTCs (Click here).

    HINT:
    It is necessary to clear the DTCs as DTC P1604 or P1605 may be stored when air is bled from the fuel system after replacing or repairing fuel system parts.

  1. Repeat steps *1 to *3.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

    OK:
    No DTCs are output.


41. INSPECT FOR COOLANT LEAK

NOTICE:
Before each inspection, turn the A/C switch off.

CAUTION:
Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 123 kPa (1.3 kgf/cm2, 18 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.


42. INSPECT FOR OIL LEAK
  1. Start the engine. Make sure that there are no oil leaks from the areas that were worked on.


43. INSPECT FOR FUEL LEAK
  1. Perform the Active Test.

    1. Connect the intelligent tester to the DLC3.

    2. Turn the engine switch on (IG).

    3. Turn the intelligent tester on.

    4. Enter the following menus: Powertrain / Engine and ECT / Active Test.

    5. Perform the Active Test.

      Intelligent Tester Display
      Test Part
      Control Range
      Diagnostic Note
      Test the Fuel Leak
      Pressurize common rail interior and check for fuel leaks
      Stop/Start
      1. The fuel pressure inside the common rail increases to the specified value and the engine speed increases to 2000 rpm when the Active Test is performed.
      2. The above conditions are maintained while the Active Test is being performed.


44. INSPECT FOR EXHAUST GAS LEAK
  1. If gas is leaking, tighten the areas necessary to stop the leak. Replace damaged parts as necessary.

45. INSTALL NO. 1 ENGINE UNDER COVER
  1. Install the No. 1 engine under cover with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


46. INSTALL FRONT BUMPER LOWER COVER
  1. Install the front bumper lower cover with the clip and 5 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

← INSPECTION (from Aug 2013)INSTALLATION (from Aug 2014) →