2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built from Aug 2013


1. INSTALL PURGE VSV
  1. Install the purge VSV with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 2 purge line hoses to the purge VSV.

  1. Connect the purge VSV connector.

← INSPECTION (from Aug 2013)INSPECTION (from Aug 2013) →