INSTALLATION
Removal / installation · Vehicles built Aug 2013 – Jul 2014
Versions by build date: Aug 2013 – Jul 2014 from Aug 2014
- HINT:
- Use the same procedure for RHD and LHD vehicles.
- The procedure listed below is for LHD vehicles.
- Use the same procedure for RHD and LHD vehicles.
| 1. INSTALL COOLER THERMISTOR (ROOM TEMPERATURE SENSOR) |
Attach the 2 claws to install the cooler thermistor.
Connect the connector and hose.
| 2. INSTALL COMBINATION METER ASSEMBLY |
Connect the 2 connectors.
Install the combination meter assembly with the 4 screws.
| 3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL ASSEMBLY |
Connect each connector.
Attach the 4 clips to install the instrument panel finish panel.
| 4. INSTALL INSTRUMENT PANEL FINISH PLATE GARNISH (for RHD) |
Connect each connector.
Attach the 4 clips to install the instrument panel finish plate garnish.
| 5. INSTALL INSTRUMENT CLUSTER FINISH PANEL ORNAMENT (for LHD) |
Attach the 3 clips to install the instrument cluster finish panel ornament.
| 6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
