2013-2015 Land Cruiser Prado · Service Manual Vehicle Exterior

INSTALLATION

Removal / installation · Vehicles built from Aug 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. INSTALL HIGH PITCHED HORN ASSEMBLY
  1. Install the high pitched horn assembly with the bolt.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. Connect the connector.


2. INSTALL LOW PITCHED HORN ASSEMBLY
  1. Install the low pitched horn assembly with the bolt.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. Connect the connector.


3. INSTALL UPPER RADIATOR SUPPORT SEAL
  1. Install the upper radiator support seal with the 13 clips.

← INSTALLATION (Aug 2013 – Jul 2014)ON-VEHICLE INSPECTION (from Aug 2013) →