REASSEMBLY
Removal / installation · Vehicles built from Aug 2013
| 1.
INSTALL INPUT SHAFT FRONT BEARING |
 |
- Using SST and a press, install a new front bearing to the input shaft.
- SST
- 09950-60010
(09951-00570)
09950-70010
(09951-07100)
- NOTICE:
- Be sure to install the input shaft front bearing with the snap ring groove on the front side.
| 2.
INSTALL FRONT BEARING SHAFT SNAP RING |
 |
Select a snap ring that makes the clearance between the input shaft and front bearing within the specification.
- Standard clearance:
- 0.10 mm (0.00394 in.) or less
- Snap Ring Thickness:
Thickness
|
2.10 mm (0.0827 in.)
|
2.15 mm (0.0846 in.)
|
2.20 mm (0.0866 in.)
|
2.25 mm (0.0886 in.)
|
2.30 mm (0.0906 in.)
|
2.35 mm (0.0925 in.)
|
2.40 mm (0.0945 in.)
|
- Using a snap ring expander, install the snap ring.
| 3.
INSTALL INPUT SHAFT BEARING |
 |
- Apply gear oil to the input shaft bearing and install it to the input shaft.
| 4.
INSTALL NO. 2 SYNCHRONIZER RING |
 |
- Apply gear oil to No. 2 synchronizer ring and install it to the input shaft.