2013-2015 Land Cruiser Prado · Service Manual Drivetrain

INSPECTION

Inspection · Vehicles built from Aug 2013


INSPECT NO. 2 SYNCHRONIZER RING

  1. G037541E01
    Apply gear oil to the cone of the input shaft, and check that the No. 2 synchronizer ring does not turn in either direction while pushing the No. 2 synchronizer ring.
    1. If the No. 1 synchronizer ring turns, replace it.

  1. D026118E01
    Push the No. 2 synchronizer ring against the cone of the input shaft. Measure the clearance between the No. 2 synchronizer ring and input shaft.

    Standard clearance:
    0.70 to 1.70 mm (0.0276 to 0.0669 in.)

    1. If the clearance is not as specified, replace the synchronizer ring No. 2 with a new one.

← DISASSEMBLY (from Aug 2013)REASSEMBLY (from Aug 2013) →