INSTALLATION
Removal / installation · Vehicles built Aug 2013 – Jul 2014
Versions by build date: Aug 2013 – Jul 2014 from Aug 2014
| 1. INSTALL NO. 2 GLOW PLUG CONTROLLER BRACKET |
Install the No. 2 glow plug controller bracket to the glow plug controller with the 2 screws.
- Torque:
- 3.0 N*m{ 31 kgf*cm , 27 in.*lbf }
| 2. INSTALL NO. 1 GLOW PLUG CONTROLLER BRACKET |
Install the No. 1 glow plug controller bracket to the glow plug controller with the 2 screws.
- Torque:
- 3.0 N*m{ 31 kgf*cm , 27 in.*lbf }
| 3. INSTALL GLOW PLUG CONTROLLER |
Install the glow plug controller with the 2 nuts.
- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Connect the 4 connectors and clamp.
| 4. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH |
Install the front fender splash shield sub-assembly with 12 new grommets.
Install the 2 screws and bolt.
| 5. INSTALL FRONT FENDER MUDGUARD LH |
Install the front fender mudguard with the 4 screws and 2 clips.
| 6. INSTALL FRONT WHEEL LH |
| 7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
