The signal check circuit detects trouble in the sensor or switch signal which cannot be detected by the DTC check.
Connecting terminals TS and CG of the DLC3 starts the signal check.
When replacing the master cylinder solenoid, perform calibration (See page Brake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>VEHICLE STABILITY CONTROL SYSTEM (for Hydraulic Brake Booster)>CALIBRATION).
Disconnect the A7 skid control ECU connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A7-24 (TS) - G48-12 (TS) | Always | Below 1 Ω |
OK
NG
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G48-4 (CG) - Body ground | Always | Below 1 Ω |
OK
NG
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G48-12 (TS) - Body ground | Always | 10 kΩ or higher |
| Result | Proceed to |
|---|---|
| NG | A |
| OK (for LHD) | B |
| NG (for RHD) | C |
A
B
C