Home › Engine / Hybrid System › 1KD-FTV (ENGINE CONTROL) › ECD SYSTEM › 2017.08–2020.08
RM27T0E _51 Engine / Hybrid System _053659 1KD-FTV ENGINE CONTROL _0260458 ECD SYSTEM J

1KD-FTV ENGINE CONTROL  ECD SYSTEM  ECM Power Source Circuit  


DESCRIPTION

When the ignition switch is turned to ON, the battery voltage is applied to terminal IGSW of the ECM. The ECM "MREL" output signal causes a current to flow to the coil, closing the contacts of the EFI relay and supplying power to terminal +B of the ECM.

WIRING DIAGRAM

A412056E02
1.844,0.917 3.563,1.323 1.719,0.406 10 false Ignition Switch Assembly*2 1.875,0.781 2.188,0.979 0.313,0.198 10 false G2 2.323,0.552 2.635,0.75 0.313,0.198 10 false AM2 2.906,0.552 3.219,0.75 0.313,0.198 10 false IG2 3.198,0.313 3.354,0.51 0.156,0.198 10 false 6 2.156,0.302 2.313,0.5 0.156,0.198 10 false 7 3.688,0.583 4.365,0.896 0.677,0.313 10 false IG2 NO. 2 5.49,0.813 6.167,1.125 0.677,0.313 10 false G213 5.563,0.417 6.24,0.729 0.677,0.313 10 false IG1D 5.49,0.979 7.021,1.281 1.531,0.302 10 false CERTIFICATION ECU*1 5.875,1.813 6.354,2 0.479,0.188 10 false IGSW 5.51,3.823 5.823,4.021 0.313,0.198 10 false G57 5.5,1.948 5.813,2.146 0.313,0.198 10 false G58 5.51,4.083 5.823,4.281 0.313,0.198 10 false G58 5.51,3.49 5.823,3.688 0.313,0.198 10 false G57 5.521,4.583 5.833,4.781 0.313,0.198 10 false G93 5.854,3.479 6.333,3.667 0.479,0.188 10 false +B2 5.865,3.823 6.344,4.01 0.479,0.188 10 false +B 4.26,1.948 4.573,2.146 0.313,0.198 10 false 1V 4.26,2.198 4.573,2.396 0.313,0.198 10 false 1V 4.229,3.833 4.542,4.031 0.313,0.198 10 false 1W 4.229,4.083 4.542,4.281 0.313,0.198 10 false 1W 4.302,1.76 4.615,1.958 0.313,0.198 10 false 1 4.313,2.406 4.625,2.604 0.313,0.198 10 false 2 4.26,3.635 4.573,3.833 0.313,0.198 10 false 10 4.313,4.26 4.625,4.458 0.313,0.198 10 false 8 2.198,4.094 2.51,4.292 0.313,0.198 10 false 1W 2.26,4.271 2.573,4.469 0.313,0.198 10 false 4 2.26,3.646 2.573,3.844 0.313,0.198 10 false 1 2.219,3.833 2.531,4.031 0.313,0.198 10 false 1S 2.188,2.208 2.5,2.406 0.313,0.198 10 false 1W 2.271,2.01 2.583,2.208 0.313,0.198 10 false 4 2.646,3.49 3.292,3.844 0.646,0.354 10 false EFI MAIN NO. 1 3.417,3.323 4.063,3.677 0.646,0.354 10 false EFI MAIN NO. 1 3.615,2.521 3.927,2.719 0.313,0.198 10 false IG2 2.781,2.083 3.094,2.281 0.313,0.198 10 false IG2 1.313,3.26 1.625,3.458 0.313,0.198 10 false P/I 0.708,1.271 1.021,1.469 0.313,0.198 10 false ST 2.51,4.521 4.208,4.938 1.698,0.417 10 false No. 1 Integration Relay 4.833,2.094 5.51,2.406 0.677,0.313 10 false IGN NO.2 0.823,4.833 1.5,5.146 0.677,0.313 10 false Battery 5.417,0.323 5.573,0.521 0.156,0.198 10 false 8 5.563,1.75 5.781,1.948 0.219,0.198 10 false 24 5.573,3.292 5.792,3.49 0.219,0.198 10 false 17 5.583,3.656 5.802,3.854 0.219,0.198 10 false 24 5.573,4.26 5.792,4.458 0.219,0.198 10 false 11 5.604,4.76 5.823,4.958 0.219,0.198 10 false 1 5.865,4.573 6.146,4.781 0.281,0.208 10 false E1 5.854,4.083 6.323,4.292 0.469,0.208 10 false MREL 1,5.479 3.042,5.823 2.042,0.344 10 false *2: w/o Entry and Start System 0.99,5.177 2.917,5.552 1.927,0.375 10 false *1: w/ Entry and Start System

CAUTION / NOTICE / HINT

NOTICE:
·

Inspect the fuses of circuits related to this system before performing the following inspection procedure.

·

After replacing the ECM, the new ECM needs registration (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>ECD SYSTEM>REGISTRATION) and initialization (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>ECD SYSTEM>INITIALIZATION).



PROCEDURE

1.INSPECT NO. 1 INTEGRATION RELAY (NO. 1 INTEGRATION RELAY - BODY GROUND)
a.
U156950E03
0.771,1.938 1.052,2.135 0.281,0.198 10 false 1S 0.198,0.208 0.479,0.406 0.281,0.198 10 false *a

Remove the No. 1 integration relay from the engine room junction block.


b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
1S-1 - Body ground Always 11 to 14 V


*a Front view of wire harness connector
(to No. 1 integration Relay)


c.

Reinstall the integration relay.



OK

2.INSPECT NO. 1 INTEGRATION RELAY (EFI , IG2)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

2.INSPECT NO. 1 INTEGRATION RELAY (EFI , IG2)
a.

Inspect the No. 1 integration relay (EFI) (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).


b.

Inspect the No. 1 integration relay (IG2) (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).



OK

3.INSPECT ECM (IGSW VOLTAGE)

NG

REPLACE NO. 1 INTEGRATION RELAY

3.INSPECT ECM (IGSW VOLTAGE)
a.
U169107E02
0.677,0.938 0.469,1.563 true 3.229,0.74 2.927,1.594 true 0.75,0.333 1.042,0.5 0.292,0.167 10 false G58 2.958,0.333 3.25,0.5 0.292,0.167 10 false C93 2.708,1.625 3.167,1.865 0.458,0.24 10 false 1 (E1) 0.083,1.594 0.896,1.823 0.813,0.229 10 false 24 (IGSW) 0.125,0.021 0.313,0.188 0.188,0.167 10 false *a

Turn the ignition switch to ON.


b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Switch Condition Specified Condition
G58-24 (IGSW) - C93-1 (E1) Ignition switch ON 11 to 14 V


Text in Illustration
*a Component with harness connected
(to ECM)


Result
Result Proceed to
OK A
NG (w/ Entry and Start System) B
NG (w/o Entry and Start System) C


A

4.CHECK WIRE HARNESS (NO. 1 INTEGRATION RELAY - ECM)

B

5.CHECK WIRE HARNESS (CERTIFICATION ECU - NO. 1 INTEGRATION RELAY)

C

6.CHECK WIRE HARNESS (IGNITION SWITCH ASSEMBLY - NO. 1 INTEGRATION RELAY)
4.CHECK WIRE HARNESS (NO. 1 INTEGRATION RELAY - ECM)
a.

Check the wire harness between the ECM and No. 1 integration relay.


b.

Disconnect the ECM connector.


c.

Remove the No. 1 integration relay from the engine room relay block.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance (Check for Open):
Tester Connection Condition Specified Condition
G58-11 (MREL) - 1W-8 Always Below 1 Ω
G57-24 (+B) - 1W-10 Always Below 1 Ω
G57-17 (+B2) - 1W-10 Always Below 1 Ω
G58-24 (IGSW) - 1V-1 Always Below 1 Ω


Standard Resistance (Check for Short):
Tester Connection Condition Specified Condition
G58-11 (MREL) or 1W-8 - Body ground Always 10 kΩ or higher
G57-24 (+B) or 1W-10 - Body ground Always 10 kΩ or higher
G57-17 (+B2) or 1W-10 - Body ground Always 10 kΩ or higher
G58-24 (IGSW) or 1V-1 - Body ground Always 10 kΩ or higher



e.

Reconnect the ECM connector.


f.

Reinstall the No. 1 integration relay.



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

5.CHECK WIRE HARNESS (CERTIFICATION ECU - NO. 1 INTEGRATION RELAY)
a.

Remove the certification ECU.


b.

Remove the No. 1 integration relay from the engine room relay block.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance (Check for Open):
Tester Connection Condition Specified Condition
G213-8 (IG1D) - 1V-2 Always Below 1 Ω


Standard Resistance (Check for Short):
Tester Connection Condition Specified Condition
G213-8 (IG1D) or 1V-2 - Body ground Always 10 kΩ or higher



d.

Reinstall the certification ECU.


e.

Reinstall the No. 1 integration relay.



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

6.CHECK WIRE HARNESS (IGNITION SWITCH ASSEMBLY - NO. 1 INTEGRATION RELAY)
a.

Disconnect the ignition switch assembly connector.


b.

Remove the No. 1 integration relay from the engine room relay block.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance (Check for Open):
Tester Connection Condition Specified Condition
G2-6 (IG2) - 1V-2 Always Below 1 Ω


Standard Resistance (Check for Short):
Tester Connection Condition Specified Condition
G2-6 (IG2) or 1V-2 - Body ground Always 10 kΩ or higher



d.

Reconnect the ignition switch assembly connector.


e.

Reinstall the No. 1 integration relay.



OK

7.INSPECT IGNITION SWITCH ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

7.INSPECT IGNITION SWITCH ASSEMBLY
a.

Inspect the ignition switch assembly (See page Engine / Hybrid System>1KD-FTV (STARTING)>IGNITION SWITCH>INSPECTION).



OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH ASSEMBLY - BATTERY)

NG

REPAIR OR REPLACE IGNITION OR STARTER SWITCH ASSEMBLY