2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)

  1. A185216E02
    Apply a light coat of engine oil to a new O-ring and install it to the oil control valve.

  1. A111699E01
    Install the oil control valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    1. Do not allow foreign matter to contact the oil seal face of the oil control valve (connecting surface with cylinder head).
    2. Be careful that the O-ring is not cracked when installing the oil control valve.

  1. Connect the camshaft timing oil control valve connector.


2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)

  1. A185217E01
    Apply a light coat of engine oil to a new O-ring and install it to the oil control valve.

  1. A111700E01
    Install the oil control valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    1. Do not allow foreign matter to contact the oil seal face of the oil control valve (connecting surface with cylinder head).
    2. Be careful that the O-ring is not cracked when installing the oil control valve.

  1. Connect the oil control valve connector.


3. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY

  1. A075599E01
    Install a new gasket and the throttle body with motor with the 4 bolts.

    Torque:
    11 N*m{ 112 kgf*cm , 8 ft.*lbf }

  1. Connect the throttle position sensor and throttle control motor connector.

  1. A075598E01
    Connect the No. 4 water by-pass hose.

  1. A075597E01
    Connect the No. 5 water by-pass hose.


4. INSTALL AIR CLEANER ASSEMBLY

  1. A151811E02
    Install the air cleaner assembly with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Tighten the hose clamp.

    HINT:
    Tighten the hose clamp until it reaches the specified protrusion height labeled A shown in the illustration.

    Standard protrusion height:
    Less than 0.5 mm (0.0197 in.)

  1. A185261
    Connect the MAF meter connector.

  1. Attach the 2 wire harness clamps.

  1. Connect the vacuum hose.

  1. A151812
    Attach the hose clamp.

  1. Connect the No. 2 ventilation hose.


5. INSTALL NO. 2 AIR CLEANER HOSE

  1. A184327E01
    Align the protrusion of the pre-cleaner with the groove of the No. 2 air cleaner hose as shown in the illustration.

  1. A178933E01
    Tighten the 2 hose clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    HINT:
    Tighten the clamp until the end of the clamp band is within both limit marks.


6. ADD ENGINE COOLANT
  1. Add engine coolant.

    Standard Capacity:
    Item
    Specified condition
    for Automatic transmission
    w/o Rear Heater
    11.2 liters (11.8 US qts, 9.9 Imp. qts)
    w/ Rear Heater
    14.4 liters (15.2 US qts, 12.7 Imp. qts)
    for Manual transmission
    w/o Rear Heater
    12.0 liters (12.7 US qts, 10.6 Imp. qts)
    w/ Rear Heater
    14.6 liters (15.4 US qts, 12.8 Imp. qts)

    NOTICE:
    Do not substitute plain water for engine coolant.

    HINT:
    TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

  1. A174295E01
    Slowly pour coolant into the radiator reservoir until it reaches the F line.

  1. Install the reservoir cap.

  1. Press the No. 1 and No. 2 radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Install the radiator cap.

  1. Set the air conditioning as follows while warming up the engine.

    Item
    Condition
    Fan speed
    Any setting except off
    Temperature
    Toward WARM
    Air conditioning switch
    Off

  1. Start the engine and warm it up until the thermostat opens.

    HINT:
    The thermostat opening timing can be confirmed by pressing the No. 2 radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. Maintain the engine speed at 2000 to 2500 rpm.

    NOTICE:
    1. Make sure that the radiator reservoir still has some coolant in it.
    2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    3. If there is not enough coolant, the engine may burn out or overheat.
    4. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the F line.
    5. Run the engine at 2000 rpm until the coolant level has stabilized.

  1. Press the No. 1 and No. 2 radiator hoses several times by hand to bleed air.

    CAUTION:
    1. Wear protective gloves. Heat areas on the parts may injure your hands.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the fan.

  1. Stop the engine, and wait until the engine coolant cools down to ambient temperature.

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A174297E01
    Check that the coolant level is between the F and L lines.
    If the coolant level is below the L line, repeat all of the procedures above.
    If the coolant level is above the F line, drain coolant so that the coolant level is between the F and L lines.


7. INSPECT FOR ENGINE COOLANT LEAK

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A174294
    Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 123 kPa (1.3 kgf/cm2, 18 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.


8. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Install the engine under cover with the 10 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


9. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

B180991
  1. Remove the 3 bolts and screw.

  1. Turn the clip indicated by the arrow in the illustration to remove the fender splash shield.


10. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

HINT:
Use the same procedures described for the LH side.


11. INSTALL V-BANK COVER

  1. A174359
    Install the V-bank cover with the 2 cap nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

← INSPECTION (from Jan 2012)INSTALLATION (from Jan 2012) →