2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSPECTION

Inspection · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


INSPECT CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

  1. A174949E01
    Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    6.9 to 7.9 Ω

    If the result is not as specified, replace the oil control valve assembly.

  1. A163613E01
    Connect the positive (+) lead of the battery to terminal 1 and the negative (-) lead to terminal 2, and check the movement of the valve.

    OK:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    Battery positive (+) voltage is applied
    Valve moves in direction of left arrow shown in the illustration
    Battery positive (+) voltage is cut off
    Valve moves in direction of right arrow shown in the illustration

    If the result is not as specified, replace the oil control valve assembly.
    If the valve cannot return properly because of foreign matter, a small pressure leak in the advanced direction may occur and a DTC may be output.

← REMOVAL (from Jan 2012)INSPECTION (from Jan 2012) →