Circuit diagnosis · Vehicles built Sep 2011 – Dec 2011
Versions by build date: Sep 2011 – Dec 2011from Jan 2012
DESCRIPTION
The ECM memory contains the programs for the normal and power shift patterns and lock-up pattern. By following the programs corresponding to the signals from the pattern select switch, the park/neutral position switch and other various sensors, the ECM switches the solenoid valves on and off, and controls the transmission gear change and the lock-up clutch operation.
WIRING DIAGRAM
INSPECTION PROCEDURE
When the pattern select (PWR) switch is pushed, switch contact is made and power mode is selected. To cancel power mode, push the pattern select (PWR) switch once again.
1. INSPECT PATTERN SELECT (PWR) SWITCH
Remove the suspension control switch (Click here).
Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Switch Condition
Specified Condition
16 (P) - 20 (E)
Pattern select (PWR) switch on
Below 1 Ω
16 (P) - 20 (E)
Pattern select (PWR) switch off
10 kΩ or higher
NG
REPLACE PATTERN SELECT (PWR) SWITCH (SUSPENSION CONTROL SWITCH) (Click here)
OK
2. CHECK HARNESS AND CONNECTOR (PATTERN SELECT (PWR) SWITCH - BODY GROUND)
Disconnect the V4 suspension control switch connector.
Measure the resistance according to the value(s) in the table below.