2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL WATER PUMP ASSEMBLY

  1. A174821E01
    Temporarily install a new gasket and the water pump with the 9 bolts and 2 nuts.
    Bolt Length 
    Item
    Length
    Bolt A
    30 mm (1.18 in.)
    Bolt B
    80 mm (3.15 in.)

  1. A174821E02
    Uniformly tighten the 9 bolts and 2 nuts of the water pump in the order shown in the illustration.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }

    NOTICE:
    After installing all of the bolts and nuts, check that all of the bolts and nuts are tightened to the torque specification.


2. INSTALL WATER OUTLET

  1. A161939
    Connect the water outlet to the No. 2 water hose joint, and install a new gasket and the water outlet with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


3. INSTALL FAN BRACKET SUB-ASSEMBLY

  1. A174820E01
    Install the fan bracket with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    Bolt Length 
    Item
    Length
    Bolt A
    30 mm (1.18 in.)
    Bolt B
    80 mm (3.15 in.)


4. INSTALL NO. 1 OIL COOLER HOSE

A174819

NOTICE:
Make sure that there is clearance between the oil cooler hose and crankshaft pulley.


5. INSTALL NO. 2 IDLER PULLEY BRACKET (w/ Viscous Heater)

  1. A180290
    Temporarily install the No. 2 idler pulley bracket with the bolt.

  1. Temporarily install the 2 bolts to the No. 2 idler pulley bracket bolt hole.

  1. A180291E01
    Uniformly tighten the 3 bolts of the No. 2 idler pulley bracket in the order shown in the illustration.

    Torque:
    49 N*m{ 495 kgf*cm , 36 ft.*lbf }


6. INSTALL NO. 2 IDLER PULLEY (w/ Viscous Heater)

  1. A177433
    Install the collar, No. 2 idler pulley and cover with the bolt.

    Torque:
    49 N*m{ 495 kgf*cm , 36 ft.*lbf }


7. INSTALL THERMOSTAT

  1. A161937E01
    Install a new gasket to the thermostat.

    NOTICE:
    When installing the gasket to the thermostat, be careful not to deform the gasket. Make sure that the groove of the gasket is properly installed onto the thermostat, as shown in the illustration.

  1. Insert the thermostat into the water pump with the jiggle valve facing straight upward.

    HINT:
    The jiggle valve may be set within 30° of either side of the prescribed position.


8. INSTALL WATER INLET

  1. A174816E01
    Install the water inlet with the 4 bolts.

    Torque:
    for bolt A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for bolt B:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }

  1. A174815
    Connect the No. 2 oil cooler hose to the clamp and water pump.


9. INSTALL NO. 1 IDLER PULLEY BRACKET (w/ Viscous Heater)

  1. A177432
    Install the No. 1 idler pulley bracket with the bolt.

    Torque:
    49 N*m{ 495 kgf*cm , 36 ft.*lbf }


10. INSTALL VISCOUS WITH MAGNET CLUTCH HEATER ASSEMBLY (w/ Viscous Heater)

E154426
  1. Install the heater assembly with the 2 bolts.

    Torque:
    48.5 N*m{ 495 kgf*cm , 36 ft.*lbf }

  1. Connect the 2 heater hoses.

  1. Using pliers, grip the claws of the clips and slide the 2 clips.

  1. Connect the connector and attach the clamp.


11. INSTALL HEATER WATER PIPE SUB-ASSEMBLY (w/ Viscous Heater)

  1. A179255
    Connect the heater water pipe to the viscous heater with magnet clutch, and install the 4 bolts.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }


12. INSTALL FAN PULLEY

13. INSTALL FAN SHROUD WITH FAN
  1. Install the shroud together with the fluid coupling fan between the radiator and engine components.

    NOTICE:
    Be careful not to damage the radiator core.

  1. A179253
    Temporarily install the fluid coupling fan to the fan bracket with the 4 nuts.

    HINT:
    Tighten the nuts as much as possible by hand.

  1. A174737
    Attach the shroud claws to the radiator.

  1. Install the shroud with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. A179253
    Tighten the 4 nuts of the fluid coupling fan.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


14. INSTALL OIL COOLER TUBE (for Automatic Transmission)

  1. C167866E01
    Temporarily install the oil cooler tube to the fan shroud with the bolt labeled A. Install the bolt labeled B. Then tighten the bolt labeled A to the specified torque.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. C175576E03
    Connect the inlet No. 4 oil cooler hose as shown in the illustration.
    Text in Illustration 
    *1
    Paint Mark

    NOTICE:
    Make sure the pinching portion of each clip is facing the direction shown in the illustration.

  1. C175577
    Connect the inlet No. 2 and No. 3 oil cooler hoses as shown in the illustration.

    NOTICE:
    Make sure the pinching portion of each clip is facing the direction shown in the illustration.

  1. C167862E02
    Connect the inlet and outlet No. 1 oil cooler hoses as shown in the illustration.
    Text in Illustration 
    *1
    Paint Mark

    NOTICE:
    Make sure the pinching portion of each clip is facing the direction shown in the illustration.

  1. Pass the hose through the flexible hose clamp and close the clamp shown in the illustration.


15. INSTALL V-RIBBED BELT

  1. A179095
    Attach a wrench to the V-ribbed belt tensioner bracket and turn the wrench clockwise.

  1. A174850
    Install the V-ribbed belt as shown in the illustration.

  1. A185945E01
    Check that the belt fits properly in the ribbed grooves.

    HINT:
    Check with your hand to confirm that the belt has not slipped out of the groove on the bottom of the pulley.
    If it has slipped out, replace the V-ribbed belt. Install a new V-ribbed belt.


16. INSTALL NO. 3 IDLER PULLEY (w/ Viscous Heater)

  1. A177431
    Align the No. 3 idler pulley bracket knock pin and No. 1 idler pulley bracket knock pin hole and install the No. 3 idler pulley with the nut.

    Torque:
    88 N*m{ 898 kgf*cm , 64 ft.*lbf }


17. INSTALL NO. 1 IDLER PULLEY (w/ Viscous Heater)

  1. A177430
    Install the collar, No. 1 idler pulley and cover with the bolt.

    Torque:
    49 N*m{ 495 kgf*cm , 36 ft.*lbf }


18. INSTALL V-RIBBED BELT (w/ Viscous Heater)

  1. A174851
    Install the V-ribbed belt as shown in the illustration.

  1. A174848
    Temporarily install the lock nut, and turn the bolt clockwise.

  1. A271744E01
    Using a belt tension gauge, inspect the belt tension.

    Standard Belt Tension:
    Item
    Condition
    Specified Condition
    New belt
    5 to 35°C (41 to 95°F)
    550 to 800 N (56 to 82 kgf, 123.6 to 179.8 lbf)
    Used belt
    5 to 35°C (41 to 95°F)
    300 to 500 N (31 to 51 kgf, 67.4 to 112.4 lbf)

    Text in Illustration 
    *a
    Measuring Point

    HINT:
    1. When measuring the tension of a new belt, measure the tension immediately after installing it to the engine but before starting the engine.
    2. A "new belt" is a belt which has been used for less than 5 minutes on a running engine.
    3. A "used belt" is a belt which has been used on a running engine for 5 minutes or more.
    4. After installing a new belt, run the engine for approximately 5 minutes and then recheck the tension.

  1. A181677
    Tighten the nut.

    Torque:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }

  1. A185945E01
    Check that the belt fits properly in the ribbed grooves.

    HINT:
    Check with your hand to confirm that the belt has not slipped out of the groove on the bottom of the pulley.
    If it has slipped out, replace the V-ribbed belt. Install a new V-ribbed belt.


19. CONNECT NO. 2 RADIATOR HOSE

20. CONNECT NO. 1 RADIATOR HOSE

21. INSTALL VANE PUMP ASSEMBLY

  1. C172309
    Apply a light coat of engine oil to a new O-ring, and install it to the vane pump.

  1. Install the vane pump with 2 new nuts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


22. INSTALL RADIATOR RESERVOIR ASSEMBLY

  1. A174738E01
    Install the radiator reservoir with the 3 bolts.

  1. Connect the 2 hoses to the upper radiator tank and water inlet.

    HINT:
    Make sure the directions of the hose clamps are as shown in the illustration.


23. INSTALL NO. 1 OIL RESERVOIR BRACKET

  1. A184319
    Install a new bracket with the 2 bolts.

    Torque:
    4.5 N*m{ 46 kgf*cm , 40 in.*lbf }


24. INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY

  1. A177429
    Install the vane pump oil reservoir to the bracket.


25. INSTALL INTAKE AIR CONNECTOR
  1. Connect the intake air connector to the No. 1 and No. 2 air cleaner pipes.

  1. Install the connector with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Tighten the 2 hose clamps.

    Torque:
    6.3 N*m{ 64 kgf*cm , 56 in.*lbf }

  1. Attach the 3 wire harness clamps.

  1. w/o Viscous Heater:
    Connect the connector to the water temperature sensor.

  1. w/ Viscous Heater:
    Connect the 2 connectors to the water temperature sensor and viscous with magnet clutch heater.


26. TEMPORARILY INSTALL NO. 1 AIR CLEANER HOSE
  1. Temporarily install the air cleaner hose to the intake air connector.


27. INSTALL AIR CLEANER CAP SUB-ASSEMBLY
  1. Connect the air cleaner cap to the air cleaner hose, and install the air cleaner cap with the 4 clamps.

  1. Connect the mass air flow meter connector and attach the wire harness clamp to the air cleaner cap.

  1. Attach the wire harness clamp.

  1. Align the protrusion of the air cleaner cap and the concave portion of the air cleaner hose.

  1. Tighten the 2 hose clamps.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


28. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY (w/ Intercooler)

  1. A174701
    Install the engine cover with the 2 nuts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


29. INSTALL NO. 3 ENGINE ROOM WIRE
  1. Install the No. 3 engine room wire to the main battery and sub-battery positive terminals with the 2 nuts.

    Torque:
    7.6 N*m{ 77 kgf*cm , 67 in.*lbf }

  1. Connect the No. 3 engine room wire with the 4 clamps.

    A174837


30. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

  1. Connect the cables to negative (-) main battery and sub-battery terminals.


31. ADD ENGINE COOLANT

  1. A179103
    Remove the engine air bleed cap.

  1. A185226
    Connect a clear hose to the engine air bleed pipe.

  1. A177426
    Using a wrench, remove the vent plug.

  1. A177425
    Fill the radiator with TOYOTA SLLC to the radiator reservoir filler neck.

    HINT:
    Pour TOYOTA SLLC until it spills out of the engine air bleed pipe.

    Standard Capacity (for Automatic Transmission):
    Item
    Specified Condition
    Front heater only
    14.8 liters (15.6 US qts, 13.0 Imp. qts)
    Front heater and rear heater
    17.6 liters (18.6 US qts, 15.5 Imp. qts)
    Front heater with viscous heater
    15.2 liters (16.1 US qts, 13.4 Imp. qts)
    Front heater and rear heater with viscous heater
    18.0 liters (19.0 US qts, 15.4 Imp. qts)

    Standard capacity (for Manual Transmission):
    15.4 liters (16.3 US qts, 13.6 Imp. qts)

    NOTICE:
    Do not substitute plain water for engine coolant.

    HINT:
    TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

  1. A177426
    Install the vent plug.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

    NOTICE:
    Do not tighten the plug to 5.0 N*m (51 kgf*cm, 44 in.*lbf) or more, as the plug will be damaged.

  1. A185226
    Disconnect the clear hose from the engine air bleed pipe.

  1. A179103
    Install the engine air bleed cap when coolant comes out.

  1. Install the radiator reservoir cap.

  1. Start the engine.

    NOTICE:
    Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the FULL line.

  1. Maintain an engine speed of 3000 rpm for approximately 10 minutes so that the thermostat opens and air bleeding is performed.

    CAUTION:
    When pressing the radiator hoses:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the radiator fan

    NOTICE:
    1. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    2. If there is not enough coolant, the engine may burn out or overheat.

    HINT:
    The thermostat opening timing can be confirmed by pressing the No. 2 radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. Stop the engine, and wait until the engine coolant cools down to ambient temperature.

    CAUTION:
    Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A174740
    Check that the coolant level is between the FULL and LOW lines.
    If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.


32. INSPECT FOR ENGINE COOLANT LEAK

CAUTION:
Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A174739
    Fill the radiator with coolant and attach a radiator cap tester to the radiator reservoir.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 123 kPa (1.3 kgf/cm2, 17.8 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks.
    If no external leaks are found, check the cylinder block and cylinder head.


33. INSTALL UPPER RADIATOR SUPPORT SEAL
  1. Install the upper radiator support seal with the 7 clips.


34. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Install the No. 1 engine under cover with the 10 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


35. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
  1. Install the front fender splash shield RH with the clip, and then install the 3 bolts and 2 screws.


36. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
  1. Install the front fender splash shield LH with the clip, and then install the 3 bolts and screw.


37. INSTALL FRONT FENDER APRON SEAL FRONT RH
  1. Install the front fender apron seal front RH with the 3 clips.


38. INSTALL FRONT WHEEL RH

Torque:
for Aluminum Wheel:
131 N*m{ 1336 kgf*cm , 97 ft.*lbf }
for Steel Wheel:
209 N*m{ 2131 kgf*cm , 154 ft.*lbf }

← INSTALLATION (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →