2011-2013 Land Cruiser · Service Manual Power Source / Network

REASSEMBLY

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL GENERATOR ROTOR ASSEMBLY
  1. Place the drive end frame on the rotor.

  1. Install the rotor and washer.


2. INSTALL GENERATOR COIL ASSEMBLY

  1. A163069
    Using a 21 mm socket wrench and a press, push in the generator coil carefully.

  1. A163057
    Install the 4 bolts.

    Torque:
    5.9 N*m{ 60 kgf*cm , 52 in.*lbf }


3. INSTALL GENERATOR BRUSH HOLDER ASSEMBLY

  1. A163070E01
    While pushing the 2 brushes toward the inside of the brush holder, insert a pin (diameter: 1.0 mm (0.0394 in.)) into the brush holder hole.

  1. A163071E01
    Install the generator brush holder with the 2 screws.

    Torque:
    1.8 N*m{ 18 kgf*cm , 16 in.*lbf }

  1. Pull out the pin from the generator brush holder.


4. INSTALL TERMINAL INSULATOR

A163055
  1. Install the terminal insulator to the generator rectifier end frame.

    NOTICE:
    Pay attention to the mounting orientation of the terminal insulator.


5. INSTALL GENERATOR REAR END COVER
  1. Install the rear end cover with the 3 nuts.

    Torque:
    4.6 N*m{ 46 kgf*cm , 40 in.*lbf }


6. INSTALL GENERATOR PULLEY

A163050E01
SST
09820-63011   (09820-06010, 09820-06021)

HINT:
SST 1-A and B
09820-06010
SST 2
09820-06021

  1. Install the pulley onto the rotor shaft by tightening the pulley nut by hand.

  1. Hold SST 1-A with a torque wrench, and tighten SST 1-B clockwise to the specified torque.

    Torque:
    39 N*m{ 398 kgf*cm , 29 ft.*lbf }

    NOTICE:
    Check that SST is secured to the rotor shaft.

  1. A163051E01
    Mount SST 2 in a vise.

  1. Insert SST 1-A and B into SST 2, and attach the pulley nut to SST 2.

  1. A163072E01
    Tighten the pulley nut by turning SST 1-A in the direction shown in the illustration.

    Torque:
    133 N*m{ 1351 kgf*cm , 98 ft.*lbf }

  1. Remove the generator from SST 2.

  1. A163053E01
    Turn SST 1-B, and remove SST 1-A and B.

  1. Turn the pulley and check that the pulley moves smoothly.

← INSPECTION (from Jan 2012)REASSEMBLY (from Jan 2012) →