The signal check circuit detects trouble in the sensor or switch signal which cannot be detected by the DTC check. Connecting terminals TS and CG of the DLC3 starts the check.
WIRING DIAGRAM
INSPECTION PROCEDURE
NOTICE:
After replacing the master cylinder solenoid, perform zero point calibration (Click here).
1. CHECK HARNESS AND CONNECTOR (SKID CONTROL ECU - DLC3 (TS))
Turn the ignition switch off.
Disconnect the A24 skid control ECU (master cylinder solenoid) connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified Condition
A24-24 (TS) - E22-12 (TS)
Always
Below 1 Ω
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
2. CHECK HARNESS AND CONNECTOR (DLC3 (CG) - BODY GROUND)
Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified Condition
E22-4 (CG) - Body ground
Always
Below 1 Ω
Text in Illustration
*1
DLC3
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
3. CHECK HARNESS AND CONNECTOR (DLC3 (TS) - BODY GROUND)
Measure the resistance according to the value(s) in the table below.