2011-2013 Land Cruiser · Service Manual Brake

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL SKID CONTROL BUZZER ASSEMBLY (for LHD)

  1. C170922
    Connect the buzzer connector.

    NOTICE:
    Securely connect the connector.

  1. Attach the clamp to install the buzzer.

    NOTICE:
    1. Securely insert the clamp into the bracket.
    2. If the buzzer is dropped, replace it.


2. INSTALL SKID CONTROL BUZZER ASSEMBLY (for RHD)

  1. C172844
    Connect the buzzer connector.

    NOTICE:
    Securely connect the connector.

  1. Attach the clamp to install the buzzer.

    NOTICE:
    1. Securely insert the clamp into the bracket.
    2. If the buzzer is dropped, replace it.


3. INSTALL NO. 1 SWITCH HOLE BASE

B180298
  1. Connect the connectors.

  1. Attach the 4 claws to install the No. 1 switch hole base.


4. INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL
  1. Connect the connectors.

  1. B180296
    for Automatic Air Conditioning System:

    1. Attach the 2 claws to install the room temperature sensor.

  1. B181942
    Attach the 2 claws to connect the 2 control cables.

  1. w/ Driver Side Knee Airbag:

    1. Attach the 16 claws to install the lower No. 1 instrument panel finish panel.

    2. Install the 2 bolts.

      B291249

  1. w/o Driver Side Knee Airbag:

    1. Attach the 9 claws to install the lower No. 1 instrument panel finish panel.

    2. Install the 2 bolts.

      B291250

  1. B182569
    Attach the 2 claws to close the hole cover.


5. INSTALL COWL SIDE TRIM BOARD

B181911
  1. Attach the 2 clips to install the cowl side trim board.

  1. Install the cap nut.


6. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

B182553
  1. Connect the connectors.

  1. Attach the 3 claws to install the No. 1 instrument panel under cover.

  1. Install the 2 screws.


7. INSTALL FRONT DOOR SCUFF PLATE

8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

← INSPECTION (from Sep 2011)INSTALLATION (from Jan 2012) →