2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSPECTION

Inspection · Vehicles built from Sep 2011


INSPECT PCV VALVE SUB-ASSEMBLY

  1. A158645E04
    Install a clean hose to the PCV valve.

  1. Check the PCV valve operation.

    1. Blow air into the cylinder head side, and check that air passes through easily.

      Text in Illustration 
      *1
      Clean Hose
      V100135
      Air

      CAUTION:
      Do not suck air through the valve.
      Petroleum substances inside the valve are hazardous to your health.

    2. A158646E04
      Blow air into the intake manifold side, and check that air passes through with difficulty.
      Text in Illustration 
      *1
      Clean Hose
      V100135
      Air
      If the result is not as specified, replace the PCV valve sub-assembly.

  1. Remove the hose from the PCV valve.

← REMOVAL (from Jan 2012)INSTALLATION (Sep 2011 – Dec 2011) →