2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL FRONT CRANKSHAFT OIL SEAL

  1. A076331E01
    Apply MP grease to the lip of a new oil seal.

  1. Using SST and a hammer, tap in the oil seal until its surface is flush with the timing chain cover edge.

    SST
    09226-10010  


2. INSTALL CRANKSHAFT PULLEY

  1. A076309E03
    Using SST, install the crankshaft pulley with the pulley set bolt.
    SST
    09213-54015   (91651-60855)
    09330-00021  

    Torque:
    250 N*m{ 2549 kgf*cm , 184 ft.*lbf }


3. INSTALL RADIATOR ASSEMBLY
  1. Install the radiator (Click here).

← REMOVAL (from Jan 2012)INSTALLATION (from Jan 2012) →