2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REASSEMBLY

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL NO. 1 STRAIGHT SCREW PLUG (w/ DPF)
  1. Install a new gasket with the No. 1 straight screw plug.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }


2. INSTALL NOZZLE HOLDER CLAMP SEAT (w/o DPF)
  1. Install the nozzle holder clamp seat.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


3. INSTALL VALVE SPRING SEAT

A075638E01

4. INSTALL VALVE STEM OIL SEAL

  1. A164546E02
    Apply a light coat of engine oil to the valve guide bush.
    Text in Illustration 
    *1
    Cylinder Head
    *a
    CORRECT
    *b
    INCORRECT

  1. Using SST, push in a new valve stem oil seal.

    SST
    09201-41020  

  1. Check that the protrusion height of the valve stem oil seal labeled A in the illustration is as specified.

    Standard protrusion height:
    Below 14.7 mm (0.579 in.)


5. INSTALL VALVE

  1. A075640E03
    Apply plenty of engine oil to the tip area of the valve as shown in the illustration.

  1. A164542E02
    Place the cylinder head on a wooden block.

  1. Install the valve, inner compression spring and valve spring retainer to the cylinder head.

    NOTICE:
    Install the same parts in the same combination to their original locations.

  1. Using SST, compress the inner compression spring and place the valve spring retainer lock around the valve stem.

    SST
    09202-70020   (09202-00010)

  1. A164832
    Using a plastic-faced hammer, lightly tap the valve stem tip to ensure a proper fit.

    NOTICE:
    Be careful not to damage the valve stem tip.

← REASSEMBLY (Sep 2011 – Dec 2011)REPAIR (from Sep 2011) →