2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

CAUTION:
Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


2. REMOVE FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

B180991
  1. Remove the 3 bolts and screw.

  1. Turn the clip indicated by the arrow in the illustration to remove the fender splash shield.


3. REMOVE FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

HINT:
Use the same procedures described for the LH side.


4. REMOVE NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

  1. A178461
    Remove the 10 bolts and No. 1 engine under cover.


5. DRAIN ENGINE COOLANT

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.


A175216E01
  1. Loosen the radiator drain cock plug.

  1. Remove the radiator cap. Then drain the coolant.

    HINT:
    Collect the coolant in a container and dispose of it according to the regulations in your area.

  1. Loosen the 2 cylinder block drain cock plugs. Then drain the coolant from the engine.

  1. Tighten the 2 cylinder block drain cock plugs.

    Torque:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf }

  1. Tighten the radiator drain cock plug by hand.


6. REMOVE TIMING BELT
  1. For the timing belt, refer to the following procedures (Click here).


7. REMOVE WATER INLET HOUSING

  1. A122973
    Remove the 2 bolts holding the water inlet housing to the water pump.

  1. Disconnect the water inlet housing from the front water by-pass joint and water pump. Then remove the water inlet and inlet housing assembly.

  1. Remove the O-ring from the water inlet housing.


8. REMOVE WATER PUMP ASSEMBLY

  1. A122974
    Remove the 5 bolts, 2 stud bolts, nut, water pump and gasket.

  1. Remove the O-ring from the water by-pass pipe.

← COMPONENTS (Sep 2011 – Dec 2011)INSPECTION (Sep 2011 – Dec 2011) →