2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. INSTALL STARTER ASSEMBLY

  1. A164439
    Connect the starter wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the starter connector.

  1. Connect the starter to the cylinder block.

  1. Connect the ground wire with the bolt.

    Torque:
    17 N*m{ 173 kgf*cm , 13 ft.*lbf }

  1. Connect the engine wire protector to the starter with the bolt.

    Torque:
    17 N*m{ 173 kgf*cm , 13 ft.*lbf }

  1. A164438
    Install the starter with the 2 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }


2. INSTALL REAR WATER BY-PASS JOINT

  1. A160761
    A070482E02
    Install 2 new gaskets and the water by-pass joint with the 4 nuts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    HINT:
    With the flat-bottom of each new gasket facing downward as shown in the illustration, install the 2 gaskets to the engine rear side.


3. INSTALL NO. 1 AIR SWITCHING VALVE ASSEMBLY (w/ Secondary Air Injection System)

  1. A182349
    Install a new gasket and the No. 1 air switching valve to the rear water by-pass joint with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the vacuum switching valve hose to the No. 1 air switching valve.


4. INSTALL NO. 2 AIR SWITCHING VALVE ASSEMBLY (w/ Secondary Air Injection System)

  1. A181856
    Install a new gasket and the No. 2 air switching valve to the rear water by-pass joint with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the vacuum switching valve hose to the No. 2 air switching valve.


5. INSTALL NO. 3 AIR TUBE (w/ Secondary Air Injection System)

  1. A179564
    Install a new gasket and connect the No. 3 air tube to the exhaust manifold with the 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install a new gasket and connect the No. 3 air tube to the No. 2 air switching valve with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


6. INSTALL AIR TUBE SUB-ASSEMBLY RH (w/ Secondary Air Injection System)

  1. A179565
    Install a new gasket and connect the air tube to the exhaust manifold with the 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install a new gasket and connect the air tube to the No. 1 air switching valve with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


7. CONNECT NO. 1 WATER BY-PASS PIPE (w/ Secondary Air Injection System)

  1. A175115
    Connect the water by-pass pipe to the cylinder head cover RH with the 2 bolts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }


8. INSTALL NO. 2 AIR INJECTION SYSTEM HOSE (w/ Secondary Air Injection System)

  1. A179559
    Install the hose.


9. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
  1. Apply soapy water to the O-ring.

  1. Install a new O-ring to the water by-pass pipe.

  1. A179561
    Push in the water by-pass pipe.

  1. Install the water by-pass pipe with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the 2 vacuum switching valve hoses to the water by-pass pipe clamp.

  1. Connect the wire harness clamp.

  1. Connect the connector.


10. INSTALL INTAKE MANIFOLD
  1. Install the intake manifold (Click here).


11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

← REASSEMBLY (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →