INSTALLATION
Removal / installation · Vehicles built from Sep 2011
| 1. INSTALL SPARK PLUG |
Install the 8 spark plugs.
- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
| 2. INSTALL IGNITION COIL ASSEMBLY |
Install the 8 ignition coils with the 8 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm , 7 in.*lbf }
Connect the 8 ignition coil connectors.
| 3. CONNECT WATER PIPE AND HOSE SUB-ASSEMBLY |
Connect the water pipe and hose and install the 2 bolts.
- Torque:
- 18 N*m{ 184 kgf*cm , 13 ft.*lbf }
| 4. INSTALL AIR CLEANER ASSEMBLY |
Install the air cleaner with the 3 bolts.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
| 5. INSTALL AIR CLEANER HOSE ASSEMBLY |
Install the air cleaner hose so that the protrusion of the air cleaner cap aligns with the groove of the hose as shown in the illustration.

Text in Illustration *1
Groove
*2
Protrusion
Tighten the 2 clamps.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Connect the vacuum hose.
Connect the No. 2 ventilation hose.
| 6. INSTALL V-BANK COVER SUB-ASSEMBLY |
Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

Text in Illustration *1
Bracket
*2
Hook
*3
Pin
*4
Grommet
| 7. INSTALL NO. 2 ENGINE UNDER COVER |
Install the No. 2 engine under cover with the 2 bolts.
- Torque:
- 29 N*m{ 296 kgf*cm , 21 ft.*lbf }