2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Sep 2011


1. INSTALL SPARK PLUG
  1. Install the 8 spark plugs.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


2. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 8 ignition coils with the 8 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 in.*lbf }

  1. Connect the 8 ignition coil connectors.


3. CONNECT WATER PIPE AND HOSE SUB-ASSEMBLY
  1. Connect the water pipe and hose and install the 2 bolts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }


4. INSTALL AIR CLEANER ASSEMBLY
  1. Install the air cleaner with the 3 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


5. INSTALL AIR CLEANER HOSE ASSEMBLY

  1. A243381E01
    Install the air cleaner hose so that the protrusion of the air cleaner cap aligns with the groove of the hose as shown in the illustration.
    Text in Illustration 
    *1
    Groove
    *2
    Protrusion

  1. Tighten the 2 clamps.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the vacuum hose.

  1. Connect the No. 2 ventilation hose.


6. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A177597E02
    Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
    Text in Illustration 
    *1
    Bracket
    *2
    Hook
    *3
    Pin
    *4
    Grommet


7. INSTALL NO. 2 ENGINE UNDER COVER
  1. Install the No. 2 engine under cover with the 2 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }

← REMOVAL (from Sep 2011)COMPONENTS (Sep 2011 – Dec 2011) →