REMOVAL
Removal / installation · Vehicles built from Sep 2011
| 1. REMOVE NO. 2 ENGINE UNDER COVER |
Remove the 2 bolts and No. 2 engine under cover.

| 2. REMOVE V-BANK COVER SUB-ASSEMBLY |
Raise the front of the V-bank cover to detach the 3 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.

Text in Illustration *1
Bracket
*2
Hook
*3
Pin
*4
Grommet
| 3. REMOVE AIR CLEANER HOSE ASSEMBLY |
Disconnect the vacuum hose and No. 2 ventilation hose.

Loosen the 2 hose clamps.
Remove the air cleaner hose.
| 4. REMOVE AIR CLEANER ASSEMBLY |
Remove the 3 bolts and air cleaner.

| 5. DISCONNECT WATER PIPE AND HOSE SUB-ASSEMBLY |
![]() ![]() |
Remove the 2 bolt and disconnect the water pipe and hose.
| 6. REMOVE IGNITION COIL ASSEMBLY |
Disconnect the 8 ignition coil connectors.

Remove the 8 bolts and 8 ignition coils.
Text in Illustration *A
for Bank 1
*B
for Bank 2
*a
Engine Front
| 7. REMOVE SPARK PLUG |
Remove the 8 spark plugs.

