2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012


1. INSTALL SPARK PLUG
  1. Using a 16 mm plug wrench, install the 8 spark plugs.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


2. INSTALL IGNITION COIL ASSEMBLY
  1. for Bank 2:

    1. Install the 4 ignition coils with the 4 bolts.

      Torque:
      10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    2. Connect the 4 ignition coil connectors.

    3. Attach the 3 clamps and connect the engine wire.

    4. Connect the water by-pass pipe with the 2 bolts.

      Torque:
      18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. for Bank 1:

    1. Install the 4 ignition coils with the 4 bolts.

      Torque:
      10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    2. Connect the 4 ignition coil connectors.

    3. Attach the 4 clamps and connect the engine wire.


3. INSTALL AIR CLEANER AND HOSE
  1. Install the air cleaner and hose with the 3 bolts, and then tighten the hose clamp.

    Torque:
    for bolt:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
    for hose clamp:
    2.5 N*m{ 25 kgf*cm , 22 in.*lbf }

  1. Attach the clamp and connect the mass air flow meter connector.

  1. Connect the No. 2 PCV hose and No. 1 air hose.


4. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A274416E01
    Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
    Text in Illustration 
    *1
    Grommet
    *2
    Pin
    *3
    Hook
    *4
    Bracket

← REMOVAL (from Jan 2012)COMPONENTS (from Jan 2012) →