2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL SPARK PLUG
  1. Install the 6 spark plugs.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }


2. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 6 ignition coils with the 6 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the 6 ignition coil connectors.


3. INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
  1. Install the No. 2 emission control valve set with the 3 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. A224703E01
    Align the paint mark with the rib and connect the No. 1 air hose.
    Text in Illustration 
    *1
    Paint Mark
    *2
    Rib
    *a
    Top
    *b
    LH Side

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. Connect the No. 2 emission control valve set connector.


4. INSTALL NO. 2 AIR TUBE (w/ Secondary Air Injection System)

  1. A226792E02
    Install 2 new gaskets.
    Text in Illustration 
    *1
    Claw
    *2
    No. 2 Air Tube

    NOTICE:
    Make sure the gasket's claws are not caught between the No. 2 emission control valve set and No. 2 air tube.

  1. Install the No. 2 air tube with the 2 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


5. INSTALL NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
  1. Install the No. 1 emission control valve set with the 3 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. A267739E01
    Align the paint mark with the rib and connect the No. 1 air hose.
    Text in Illustration 
    *1
    Rib
    *2
    Paint Mark
    *a
    RH Side
    *b
    Top

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. Connect the No. 1 emission control valve set connector.


6. INSTALL AIR TUBE (w/ Secondary Air Injection System)

  1. A226791E02
    Install 2 new gaskets.
    Text in Illustration 
    *1
    Claw
    *2
    Air Tube

    NOTICE:
    Make sure the gasket's claws are not caught between the No. 1 emission control valve set and air tube.

  1. Install the air tube with the 2 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 in.*lbf }


7. INSTALL AIR CLEANER CASE SUB-ASSEMBLY
  1. Install the air cleaner case with the 3 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Install the air cleaner filter element.


8. INSTALL AIR CLEANER CAP AND HOSE

  1. A267625E01
    Install the air cleaner cap and hose.
    Text in Illustration 
    *a
    Top
    *b
    Front
    *c
    Protrusion (Hose)
    *d
    Protrusion (Throttle body)

    1. Install the air cleaner cap and hose with the bolt and fasten the 4 hook clamps.

      Torque:
      5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    2. Tighten the clamp.

      Torque:
      2.5 N*m{ 25 kgf*cm , 22 in.*lbf }

    3. Attach the 4 clamps and connect the No. 2 PCV hose, vacuum hose and mass air flow meter connector.

      HINT:
      The direction of the hose clamp is indicated in the illustration.


9. INSTALL V-BANK COVER

  1. A271365E01
    Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
    Text in Illustration 
    *1
    Pin
    *2
    Hook

← INSTALLATION (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →