INSTALLATION
Removal / installation · Vehicles built from Jan 2012
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
| 1. INSTALL SPARK PLUG |
Install the 6 spark plugs.
- Torque:
- 18 N*m{ 184 kgf*cm , 13 ft.*lbf }
| 2. INSTALL IGNITION COIL ASSEMBLY |
Install the 6 ignition coils with the 6 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm , 7 ft.*lbf }
Connect the 6 ignition coil connectors.
| 3. INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System) |
Install the No. 2 emission control valve set with the 3 nuts.
- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
Align the paint mark with the rib and connect the No. 1 air hose.

Text in Illustration *1
Paint Mark
*2
Rib
*a
Top
*b
LH Side
- HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
Connect the No. 2 emission control valve set connector.
| 4. INSTALL NO. 2 AIR TUBE (w/ Secondary Air Injection System) |
Install 2 new gaskets.

Text in Illustration *1
Claw
*2
No. 2 Air Tube
- NOTICE:
- Make sure the gasket's claws are not caught between the No. 2 emission control valve set and No. 2 air tube.
Install the No. 2 air tube with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{ 102 kgf*cm , 7 ft.*lbf }
| 5. INSTALL NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System) |
Install the No. 1 emission control valve set with the 3 nuts.
- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
Align the paint mark with the rib and connect the No. 1 air hose.

Text in Illustration *1
Rib
*2
Paint Mark
*a
RH Side
*b
Top
- HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
Connect the No. 1 emission control valve set connector.
| 6. INSTALL AIR TUBE (w/ Secondary Air Injection System) |
Install 2 new gaskets.

Text in Illustration *1
Claw
*2
Air Tube
- NOTICE:
- Make sure the gasket's claws are not caught between the No. 1 emission control valve set and air tube.
Install the air tube with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{ 102 kgf*cm , 7 in.*lbf }
| 7. INSTALL AIR CLEANER CASE SUB-ASSEMBLY |
Install the air cleaner case with the 3 bolts.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Install the air cleaner filter element.
| 8. INSTALL AIR CLEANER CAP AND HOSE |
Install the air cleaner cap and hose.

Text in Illustration *a
Top
*b
Front
*c
Protrusion (Hose)
*d
Protrusion (Throttle body)
Install the air cleaner cap and hose with the bolt and fasten the 4 hook clamps.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Tighten the clamp.
- Torque:
- 2.5 N*m{ 25 kgf*cm , 22 in.*lbf }
Attach the 4 clamps and connect the No. 2 PCV hose, vacuum hose and mass air flow meter connector.
- HINT:
- The direction of the hose clamp is indicated in the illustration.
| 9. INSTALL V-BANK COVER |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.

Text in Illustration *1
Pin
*2
Hook
