INSTALLATION
Removal / installation · Vehicles built Sep 2011 – Dec 2011
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
| 1.
INSTALL SPARK PLUG |
 |
Install the 6 spark plugs.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
| 2.
INSTALL IGNITION COIL ASSEMBLY |
 |
- Install the 6 ignition coils with the 6 bolts.
-
Torque:
- 9.0 N*m{
92 kgf*cm
, 80 in.*lbf
}
Connect the 6 ignition coil connectors.
| 3.
INSTALL NO. 2 SURGE TANK STAY |
 |
for Manual Transmission:
Temporarily install the No. 2 surge tank stay with the 2 bolts labeled A and nut labeled B.
Tighten the bolts labeled A.
-
Torque:
- 21 N*m{
214 kgf*cm
, 15 ft.*lbf
}
Tighten the nut labeled B.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
- for Automatic Transmission:
Install the No. 2 surge tank stay with the 2 bolts.
-
Torque:
- 21 N*m{
214 kgf*cm
, 15 ft.*lbf
}
| 4.
INSTALL AIR CLEANER CAP SUB-ASSEMBLY |
 |
Install the air cleaner cap and fasten the 2 hook clamps.
| 5.
INSTALL NO. 2 AIR CLEANER HOSE
|
 |
- Align the protrusion of the pre-cleaner with the groove of the No. 2 air cleaner hose as shown in the illustration.
- Tighten the 2 hose clamps.
-
Torque:
- 4.0 N*m{
41 kgf*cm
, 35 in.*lbf
}
- HINT:
- Tighten the clamp until the end of the clamp band is within both limit marks.
| 6.
INSTALL V-BANK COVER
|
 |
- Install the V-bank cover with the 2 cap nuts.
-
Torque:
- 7.5 N*m{
76 kgf*cm
, 66 in.*lbf
}