2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL SPARK PLUG
  1. Install the 6 spark plugs.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }


2. INSTALL IGNITION COIL ASSEMBLY

  1. A175728
    Install the 6 ignition coils with the 6 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 6 ignition coil connectors.


3. INSTALL NO. 2 SURGE TANK STAY

A175732E02
  1. for Manual Transmission:

    1. Temporarily install the No. 2 surge tank stay with the 2 bolts labeled A and nut labeled B.

    2. Tighten the bolts labeled A.

      Torque:
      21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    3. Tighten the nut labeled B.

      Torque:
      20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. A175740
    for Automatic Transmission:
    Install the No. 2 surge tank stay with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

A175745
  1. Install the air cleaner cap and fasten the 2 hook clamps.


5. INSTALL NO. 2 AIR CLEANER HOSE

  1. A184327E01
    Align the protrusion of the pre-cleaner with the groove of the No. 2 air cleaner hose as shown in the illustration.

  1. A178933E01
    Tighten the 2 hose clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    HINT:
    Tighten the clamp until the end of the clamp band is within both limit marks.


6. INSTALL V-BANK COVER

  1. A174359
    Install the V-bank cover with the 2 cap nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

← REMOVAL (from Jan 2012)INSTALLATION (from Jan 2012) →