REMOVAL
Removal / installation · Vehicles built from Jan 2012
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
| 1.
REMOVE V-BANK COVER
|
 |
- Raise the front of the V-bank cover to detach the 2 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
Text in Illustration
*1
|
Pin
|
*2
|
Hook
|
| 2.
REMOVE AIR CLEANER CAP AND HOSE |
 |
Remove the air cleaner cap and hose.
- Disconnect the mass air flow meter connector, vacuum hose and No. 2 PCV hose and detach the clamp.
Loosen the clamp.
Unfasten the 4 hook clamps, and then remove the bolt and the air cleaner cap and hose.
| 3.
REMOVE AIR CLEANER CASE SUB-ASSEMBLY
|
 |
Remove the air cleaner filter element.
- Remove the 3 bolts and air cleaner case.
| 4.
REMOVE AIR TUBE (w/ Secondary Air Injection System)
|
 |
- Remove the 2 bolts, 2 nuts and air tube.
Remove the 2 gaskets.
- NOTICE:
- Be careful not to damage the installation surface of the gaskets.
| 5.
REMOVE NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
|
 |
- Disconnect the No. 1 emission control valve set connector.
Disconnect the No. 1 air hose from the No. 1 emission control valve set.
- Remove the 3 nuts and No. 1 emission control valve set.
| 6.
REMOVE NO. 2 AIR TUBE (w/ Secondary Air Injection System)
|
 |
- Remove the 2 bolts, 2 nuts and No. 2 air tube.
Remove the 2 gaskets.
- NOTICE:
- Be careful not to damage the installation surface of the gaskets.
| 7.
REMOVE NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)
|
 |
- Disconnect the No. 2 emission control valve set connector.
Disconnect the No. 3 air hose.
- Remove the 3 nuts and No. 2 emission control valve set.
| 8.
REMOVE IGNITION COIL ASSEMBLY |
 |
- Disconnect the 6 ignition coil connectors.
Text in Illustration
*A
|
Bank 1
|
*B
|
Bank 2
|
Remove the 6 bolts and 6 ignition coils.
| 9.
REMOVE SPARK PLUG |
 |
Remove the 6 spark plugs.