2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. REMOVE V-BANK COVER

  1. A267633E01
    Raise the front of the V-bank cover to detach the 2 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
    Text in Illustration 
    *1
    Pin
    *2
    Hook


2. REMOVE AIR CLEANER CAP AND HOSE

  1. Remove the air cleaner cap and hose.

    1. A267624
      Disconnect the mass air flow meter connector, vacuum hose and No. 2 PCV hose and detach the clamp.

    2. Loosen the clamp.

    3. Unfasten the 4 hook clamps, and then remove the bolt and the air cleaner cap and hose.


3. REMOVE AIR CLEANER CASE SUB-ASSEMBLY
  1. Remove the air cleaner filter element.

  1. A270980
    Remove the 3 bolts and air cleaner case.


4. REMOVE AIR TUBE (w/ Secondary Air Injection System)

  1. A223569
    Remove the 2 bolts, 2 nuts and air tube.

  1. Remove the 2 gaskets.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.


5. REMOVE NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)

  1. A267738
    Disconnect the No. 1 emission control valve set connector.

  1. Disconnect the No. 1 air hose from the No. 1 emission control valve set.

  1. A223570
    Remove the 3 nuts and No. 1 emission control valve set.


6. REMOVE NO. 2 AIR TUBE (w/ Secondary Air Injection System)

  1. A223563
    Remove the 2 bolts, 2 nuts and No. 2 air tube.

  1. Remove the 2 gaskets.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.


7. REMOVE NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)

  1. A223562
    Disconnect the No. 2 emission control valve set connector.

  1. Disconnect the No. 3 air hose.

  1. A223564
    Remove the 3 nuts and No. 2 emission control valve set.


8. REMOVE IGNITION COIL ASSEMBLY

  1. A272605E01
    Disconnect the 6 ignition coil connectors.
    Text in Illustration 
    *A
    Bank 1
    *B
    Bank 2

  1. Remove the 6 bolts and 6 ignition coils.


9. REMOVE SPARK PLUG
  1. Remove the 6 spark plugs.

← REMOVAL (Sep 2011 – Dec 2011)INSTALLATION (Sep 2011 – Dec 2011) →