2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)

  1. A180921
    Install the VSV with the bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the VSV connector and 2 vacuum hoses.

  1. A177064
    Connect the VSV connector with the bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


2. INSTALL INTAKE MANIFOLD
  1. Install the intake manifold (Click here).

← INSPECTION (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →