2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012

HINT:
  1. Use the same procedures for LHD and RHD vehicles.
  2. The procedures listed below are for LHD vehicles.


1. INSTALL CRUISE CONTROL MAIN SWITCH

  1. B179762
    Install the switch.

  1. B179760
    Install the 2 screws.

  1. B179759
    Connect the connector and clamp.


2. INSTALL STEERING PAD
  1. With the steering pad installed on the vehicle, perform a visual check. If there are any defects as mentioned below, replace the steering pad with a new one:
    Cuts, minute cracks or marked discoloration on the steering pad top surface or in the grooved portion.

  1. Make sure that the horn sounds.

    HINT:
    If the horn does not sound, inspect the horn system.


3. INSTALL LOWER NO. 2 STEERING WHEEL COVER

  1. B189186E01
    Attach the 2 claws to install the cover.


4. INSTALL LOWER NO. 3 STEERING WHEEL COVER

  1. B181563
    Attach the 2 claws to install the cover.


5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


6. CHECK SRS WARNING LIGHT
  1. Check the SRS warning light (Click here).