2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

DISASSEMBLY

Removal / installation · Vehicles built from Jan 2012


1. REMOVE MAGNET STARTER SWITCH ASSEMBLY

  1. A258287
    Remove the nut and disconnect the lead wire from terminal C.

  1. A258288
    Remove the 2 nuts from the starter drive housing while holding the magnet starter switch.

  1. A265859
    Pull the magnet starter switch and while lifting the front part of the magnet starter switch, release the plunger hook from the pinion drive lever and remove the magnet starter switch.


2. REMOVE STARTER YOKE ASSEMBLY

  1. A258289
    Using a T25 "TORX" socket wrench, remove the 2 bolts.

  1. Pull out the starter yoke together with the starter commutator end frame.

  1. A258293
    Remove the 2 screws and starter commutator end frame from the starter yoke.

    NOTICE:
    While holding down the lead wire, remove the starter commutator end frame.


3. REMOVE STARTER BRUSH HOLDER ASSEMBLY

  1. A215969
    Using a screwdriver, pry the end of the spring away from each brush and pull out the 4 brushes from the starter brush holder so that they are held in place by the springs.

  1. Remove the starter brush holder.


4. REMOVE STARTER ARMATURE ASSEMBLY

  1. A262991
    Remove the starter armature from the starter yoke.


5. REMOVE STARTER CENTER BEARING CLUTCH SUB-ASSEMBLY

  1. A258315
    Remove the starter armature plate from the starter center bearing clutch or starter yoke.

  1. A258316
    Remove the 3 planetary gears from the starter center bearing clutch.

  1. A258317E02
    Remove the starter center bearing clutch together with the pinion drive lever and rubber seal from the starter drive housing.
    Text in Illustration 
    *1
    Starter Center Bearing Clutch
    *2
    Pinion Drive Lever
    *3
    Rubber Seal

  1. Remove the pinion drive lever and rubber seal from the starter center bearing clutch.

← REMOVAL (from Jan 2012)INSPECTION (from Jan 2012) →