2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. INSPECT CYLINDER HEAD SET BOLT

  1. A142747E02
    Using a vernier caliper, measure the thread outside diameter of the bolt.

    Measuring Point:
    Item
    Specified Condition
    Intake side
    82 mm (3.23 in.)
    Exhaust side
    86 mm (3.39 in.)

    Standard outside diameter:
    9.810 to 9.960 mm (0.386 to 0.392 in.)

    Minimum outside diameter:
    9.700 mm (0.382 in.)

    If the outside diameter is less than the minimum, replace the cylinder head set bolt.

    HINT:
    If a visual check reveals no excessively thin areas, check the center of the bolt (see illustration) and find the area that has the minimum diameter.


2. INSPECT CYLINDER HEAD SUB-ASSEMBLY

  1. A107611E04
    Using a precision straightedge and feeler gauge, measure the surfaces contacting the cylinder block and manifolds for warpage.

    Standard Warpage:
    Item
    Specified Condition
    Cylinder block side
    0 to 0.05 mm (0 to 0.00197 in.)
    Intake manifold side
    0 to 0.08 mm (0 to 0.00315 in.)
    Exhaust manifold side
    0 to 0.08 mm (0 to 0.00315 in.)

    Maximum warpage:
    0.10 mm (0.00394 in.)

    1. If the warpage is more than the maximum, replace the cylinder head sub-assembly.

  1. A053866E01
    Using a dye penetrant, check the combustion chamber, intake ports, exhaust ports and cylinder block surface for cracks.
    If the cylinder head is cracked, replace it.


3. INSTALL CYLINDER HEAD GASKET LH

  1. A160768
    Clean the cylinder block and cylinder head with solvent.

  1. Place a new cylinder head gasket in position on the cylinder block.

    HINT:
    A mark is placed on the rear side of the cylinder head gasket to distinguish the LH and RH sides, a "2R" mark for the RH side and a "2L" mark for the LH side.

    NOTICE:
    Be careful of the installation direction.


4. INSTALL CYLINDER HEAD LH

HINT:
The cylinder head bolts are tightened in 3 progressive steps.

  1. G039657E01
    Check that the timing mark of the crankshaft timing pulley is in the position shown in the illustration, and that the piston is below the TDC of compression.

  1. Install the cylinder head with the exhaust manifold to the cylinder block.

    NOTICE:
    Ensure that no oil is on the mounting surface of the cylinder head.

  1. Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.

  1. Step 1:

    1. Set the plate washer to the cylinder head bolt.

    2. A115101E06
      Install and uniformly tighten the 10 cylinder head bolts and plate washers in the sequence shown in the illustration.

      Torque:
      40 N*m{ 408 kgf*cm , 30 ft.*lbf }

      If any one of the cylinder head bolts does not meet the torque specification, replace the cylinder head bolt.

      NOTICE:
      Do not drop the plate washer for the cylinder head bolt of the cylinder head.

  1. Step 2:

    1. A115112E02
      Mark the cylinder head bolt head with paint as shown in the illustration.

    2. Tighten the cylinder head bolts 90° in the sequence shown in step 1.

  1. Step 3:

    1. Tighten the cylinder head bolts another 90° in the sequence shown in step 1.

    2. Check that the painted marks are now facing rearward.


5. INSTALL CYLINDER HEAD GASKET

  1. A160769
    Clean the cylinder block and cylinder head with solvent.

  1. Place a new cylinder head gasket in position on the cylinder block.

    HINT:
    A mark is placed on the rear side of the cylinder head gasket to distinguish the LH and RH sides, a "2R" mark for the RH side and a "2L" mark for the LH side.

    NOTICE:
    Be careful of the installation direction.


6. INSTALL CYLINDER HEAD SUB-ASSEMBLY

HINT:
The cylinder head bolts are tightened in 3 progressive steps.

  1. Install the cylinder head with the exhaust manifold to the cylinder block.

    NOTICE:
    Ensure that no oil is on the mounting surface of the cylinder head.

  1. Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.

  1. Step 1:

    1. Set the plate washer to the cylinder head bolt.

    2. A115100E05
      Install and uniformly tighten the 10 cylinder head bolts and plate washers in the sequence shown in the illustration.

      Torque:
      40 N*m{ 408 kgf*cm , 30 ft.*lbf }

      If any one of the cylinder head bolts does not meet the torque specification, replace the cylinder head bolt.

      NOTICE:
      Do not drop the plate washer for the cylinder head bolt of the cylinder head.

  1. Step 2:

    1. A115112E02
      Mark the cylinder head bolt head with paint as shown in the illustration.

    2. Tighten the cylinder head bolts 90° in the sequence shown in step 1.

  1. Step 3:

    1. Tighten the cylinder head bolts another 90° in the sequence shown in step 1.

    2. Check that the painted marks are now facing rearward.


7. INSTALL VALVE LIFTER

  1. A123865E01
    Apply a light coat of engine oil to the valve lifters and adjusting shims.

  1. Install the valve lifters and shims to the cylinder head.

  1. Check that the valve lifter rotates smoothly by hand.


8. INSTALL CAMSHAFT SETTING OIL SEAL
  1. Apply MP grease to the lip of a new oil seal.

    NOTICE:
    1. Do not allow foreign matter to contact the lip of the oil seal.
    2. Do not allow MP grease to contact the dust seal.

  1. A176492E01
    Insert the oil seal into the camshaft timing tube until it reaches the stopper.

    NOTICE:
    1. Be careful of the installation direction.
    2. Do not turn over the lip of the oil seal.


9. INSTALL CAMSHAFT DRIVE GEAR

  1. A054965E06
    Align the timing tube knock pin with the knock pin groove of the drive gear, and temporarily install the drive gear with the 4 bolts.

  1. Using SST and a 5 mm hexagon wrench, uniformly tighten the 4 bolts in several steps, in the sequence shown in the illustration.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

    SST
    09960-10010   (09962-01000, 09963-00500)

    NOTICE:
    Be careful not to damage the timing tube.


10. INSTALL CAMSHAFT TIMING TUBE ASSEMBLY

  1. A054967E02
    Mount the hexagonal portion of the camshaft in a vise.

    NOTICE:
    Be careful not to damage the camshaft.

  1. Apply a light coat of engine oil to the camshaft and camshaft timing tube.

  1. A118091E01
    Align the camshaft knock pin with the knock pin hole of the timing tube, and push the timing tube by hand until the camshaft knock pin touches the bottom of the timing tube knock pin hole.

    NOTICE:
    Do not forcefully push on the camshaft timing tube. This may cause the camshaft knock pin tip to damage the installation surface of the camshaft timing tube.

  1. Using a 10 mm socket hexagon wrench, install the bolt.

    Torque:
    78 N*m{ 795 kgf*cm , 58 ft.*lbf }

  1. Install the seal washer and screw plug.

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }


11. INSTALL CAMSHAFT
  1. Install the camshaft (Click here).


12. INSTALL REAR TIMING BELT PLATE LH

  1. A176457
    Install the timing belt plate with the bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


13. INSTALL REAR NO. 2 TIMING BELT PLATE LH

  1. A176456
    Install the timing plate with the 2 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


14. INSTALL REAR TIMING BELT PLATE RH

  1. A176455
    Install the timing belt plate with the bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


15. INSTALL REAR NO. 2 TIMING BELT PLATE RH

  1. A175265
    Install the timing plate with the 2 bolts and stud bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


16. INSTALL REAR WATER BY-PASS JOINT

  1. A160761
    A070482E02
    Install 2 new gaskets and the water by-pass joint with the 4 nuts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    HINT:
    With the flat-bottom of each new gasket facing downward as shown in the illustration, install the 2 gaskets to the engine rear side.


17. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
  1. Apply soapy water to the O-ring.

  1. Install a new O-ring to the water by-pass pipe.

  1. A179561
    Push in the water by-pass pipe.

  1. Install the water by-pass pipe with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the 2 vacuum switching valve hoses to the water by-pass pipe clamp.

  1. Connect the wire harness clamp.

  1. Connect the connector.


18. INSTALL FRONT WATER BY-PASS JOINT

  1. A178902E01
    Install 2 new gaskets and the water by-pass joint with the 4 nuts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    HINT:
    With the flat-bottom of each new gasket facing downward as shown in the illustration, install the 2 gaskets to the engine front side.


19. INSTALL WATER INLET HOUSING

  1. A122971E03
    Apply soapy water to a new O-ring and install it to the water inlet housing.

  1. Apply seal packing in a continuous line to the places shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing 1282B, Three Bond 1282B or equivalent

    Standard seal diameter:
    2.0 to 3.0 mm (0.0787 to 0.118 in.)

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the water inlet housing within 3 minutes after applying seal packing.

  1. A122972E01
    Temporarily install the water inlet housing with the 2 bolts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    Bolt Length:
    Item
    Length
    Bolt A
    77 mm (3.03 in.)
    Bolt B
    22 mm (0.866 in.)


20. INSTALL NO. 2 AIR SWITCHING VALVE ASSEMBLY (w/ Secondary Air Injection System)

  1. A181856
    Install a new gasket and the No. 2 air switching valve to the rear water by-pass joint with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the vacuum switching valve hose to the No. 2 air switching valve.


21. INSTALL NO. 1 AIR SWITCHING VALVE ASSEMBLY (w/ Secondary Air Injection System)

  1. A182349
    Install a new gasket and the No. 1 air switching valve to the rear water by-pass joint with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the vacuum switching valve hose to the No. 1 air switching valve.


22. INSTALL NO. 3 AIR TUBE (w/ Secondary Air Injection System)

  1. A179564
    Install a new gasket and connect the No. 3 air tube to the exhaust manifold with the 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install a new gasket and connect the No. 3 air tube to the No. 2 air switching valve with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


23. INSTALL AIR TUBE SUB-ASSEMBLY RH (w/ Secondary Air Injection System)

  1. A179565
    Install a new gasket and connect the air tube to the exhaust manifold with the 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install a new gasket and connect the air tube to the No. 1 air switching valve with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


24. INSTALL INTAKE MANIFOLD
  1. Install the intake manifold (Click here).


25. CONNECT FRONT EXHAUST PIPE ASSEMBLY
  1. Install the exhaust manifold RH with the bolt.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }

  1. Install the 2 gaskets to the front exhaust pipe and connect the front exhaust pipe to the exhaust manifold RH and center exhaust pipe. Then install the 3 nuts and 2 bolts.

    Torque:
    for bolt:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }
    for nut:
    54 N*m{ 554 kgf*cm , 40 ft.*lbf }

  1. Connect the air fuel ratio sensor connector.

  1. Connect the heated oxygen sensor connector.

  1. Attach the heated oxygen sensor wire clamp.


26. CONNECT FRONT NO. 2 EXHAUST PIPE ASSEMBLY
  1. Install the exhaust manifold LH with the bolt.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }

  1. Install the 2 gaskets to the front No. 2 exhaust pipe and connect the front No. 2 exhaust pipe to the exhaust manifold LH and center exhaust pipe. Then install the 3 nuts and 2 bolts.

    Torque:
    for bolt:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }
    for nut:
    54 N*m{ 554 kgf*cm , 40 ft.*lbf }

  1. Connect the air fuel ratio sensor connector.

  1. Connect the heated oxygen sensor connector.


27. ADD ENGINE OIL
  1. Install a new gasket and the drain plug.

    Torque:
    39 N*m{ 398 kgf*cm , 29 ft.*lbf }

  1. Add new engine oil.

    Standard Engine Oil:
    Oil Grade
    Oil Viscosity (SAE)
    API grade SL "Energy-Conserving", SM "Energy-Conserving" or ILSAC multigrade engine oil
    10W-30
    (10W-30 is best choice for fuel economy and good starting in cold weather).
    API grade SL or SM multigrade engine oil
    10W-30

    Standard Oil Capacity:
    Item
    Specified Condition
    Drain and refill with oil filter change
    6.2 liters (6.6 US qts, 5.5 Imp. qts)
    Drain and refill without oil filter change
    5.7 liters (6.0 US qts, 5.0 Imp. qts)
    Dry fill
    7.1 liters (7.5 US qts, 6.2 Imp. qts)


28. ADD ENGINE COOLANT
  1. Add engine coolant.

    Standard Capacity:
    Item
    Specified Condition
    w/o Transmission oil cooler
    w/o Rear Heater
    13.4 liters (14.2 US qts, 11.8 Imp. qts)
    w/ Rear Heater
    16.3 liters (17.2 US qts, 14.3 Imp. qts)
    w/ Transmission oil cooler
    w/o Rear Heater
    14.1 liters (14.9 US qts, 12.4 Imp. qts)
    w/ Rear Heater
    16.9 liters (17.9 US qts, 14.9 Imp. qts)

    HINT:
    TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

  1. A168577
    Slowly pour coolant into the radiator reservoir until it reaches the F line.

  1. Install the radiator reservoir cap.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Install the radiator cap.

  1. Start the engine and warm it up until the thermostat opens.

    NOTICE:
    Switch off the A/C.

  1. Maintain the engine speed at 2000 to 2500 rpm.

    NOTICE:
    1. Make sure that the radiator reservoir still has some coolant in it.
    2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    3. If there is not enough coolant, the engine may burn out or overheat.
    4. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the F line.
    5. Run the engine at 2000 rpm until the coolant level has stabilized.

  1. Press the inlet and outlet radiator hoses several times by hand to bleed air.

    CAUTION:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the cooling fan.

  1. Stop the engine, and wait until the engine coolant cools down to the ambient temperature.

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A168578
    Check that the coolant level is between the F and L lines. If the coolant level is below the L line, repeat all of the procedures above. If the coolant level is above the F line, drain coolant so that the coolant level is between the F and L lines.


29. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


30. INSPECT FOR OIL LEAK
  1. Start the engine. Make sure that there are no oil leaks from the area that was worked on.


31. INSPECT FOR COOLANT LEAK

  1. A168576
    Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 123 kPa (1.3 kgf/cm2, 18 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.


32. INSPECT FOR FUEL LEAK
  1. Connect the intelligent tester to the DLC3.

  1. Turn the engine switch on (IG) and intelligent tester ON.

    NOTICE:
    Do not start the engine.

  1. Enter the following menus: Powertrain / Engine and ECT / Active Test / Activate the Fuel Pump Speed Control.

  1. Check that there are no fuel leaks after doing maintenance anywhere on the fuel system.


33. INSPECT FOR EXHAUST GAS LEAK
If gas is leaking, tighten the areas necessary to stop the leak. Replace damaged parts as necessary.

34. CHECK ENGINE OIL LEVEL
  1. Warm up the engine, then stop the engine and wait for 5 minutes.

  1. Check that the engine oil level is between the low level and full level marks on the dipstick.
    If low, check for leakage and add oil up to the full level mark.

    NOTICE:
    Do not fill engine oil above the full level mark.


35. INSPECT IGNITION TIMING
  1. Warm up and stop the engine.

    1. Allow the engine to warm up to a normal operating temperature.

  1. When using the intelligent tester:

    1. Connect the intelligent tester to the DLC3.

      NOTICE:
      Switch off all accessories and the A/C before connecting the intelligent tester.

    2. Start the engine and idle it.

    3. Push the intelligent tester main switch ON.

    4. Enter the following menus: Powertrain / Engine and ECT / Data List / Primary / IGN Advance.

      HINT:
      Refer to the intelligent tester operator's manual for further details.

      Standard ignition timing:
      5 to 15° BTDC @ idling (transmission in neutral and A/C switch off)

    5. Disconnect the intelligent tester from the DLC3.

  1. A180851
    When not using the intelligent tester:

    1. Remove the 2 nuts and V-bank cover.

    2. Connect the tester probe of a timing light to the wire of the ignition coil connector for the No. 1 cylinder.

      NOTICE:
      Use a timing light that detects primary signals.

    3. H102392E79
      Using SST, connect terminals 13 (TC) and 4 (CG) of the DLC3.
      SST
      09843-18040  

      NOTICE:
      1. Confirm the terminal numbers before connecting them. Connecting the wrong terminals can damage the engine.
      2. Switch off all accessories and the A/C.

    4. A004459E01
      Using the timing light, check the ignition timing.

      Ignition timing:
      5 to 15° BTDC @ idling (transmission in neutral and A/C switch off)

    5. Remove SST from the DLC3.

    6. Disconnect the timing light from the engine.

    7. Install the V-bank cover with the 2 nuts.

      Torque:
      7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


36. INSPECT ENGINE IDLE SPEED
  1. Warm up and stop the engine.

    1. Allow the engine to warm up to a normal operating temperature.

  1. When using the intelligent tester:

    1. Connect the intelligent tester to the DLC3.

      NOTICE:
      Switch off all accessories and the A/C before connecting the intelligent tester.

    2. Race the engine at 2500 rpm for approximately 90 seconds.

    3. Push the intelligent tester main switch ON.

    4. Enter the following menus: Powertrain / Engine and ECT / Data List / Primary / Engine Speed.

      Standard idle speed:
      650 to 750 rpm (transmission in neutral and A/C switch off)

      HINT:
      Refer to the intelligent tester operator's manual for further details.

      If the idle speed is not as specified, check the air intake system.

    5. Disconnect the intelligent tester from the DLC3.

  1. H102392E88
    When not using the intelligent tester:

    1. Using SST, connect a tachometer probe to terminal 9 (TAC) of the DLC3.

      SST
      09843-18030  

      NOTICE:
      1. Confirm the terminal number before connecting the probe. Connecting the probe to the wrong terminal can damage the engine.
      2. Switch off all accessories and the A/C.

    2. Race the engine at 2500 rpm for approximately 90 seconds.

    3. Check the idle speed.

      Standard idle speed:
      650 to 750 rpm (transmission in neutral and A/C switch off)

      If the idle speed is not as specified, check the air intake system.

    4. Disconnect the tachometer from the DLC3.


37. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY
  1. Install the cowl top ventilator louver (Click here).


38. INSTALL NO. 2 ENGINE UNDER COVER

  1. A178462
    Install the No. 2 engine under cover with the 2 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


39. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

  1. A178461
    Install the No. 1 engine under cover with the 10 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


40. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

HINT:
Use the same procedures described for the LH side.


41. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

B180991
  1. Push in the clip indicated by the arrow in the illustration to install the fender splash shield.

  1. Install the 3 bolts and screw.


42. INSPECT ENGINE COOLANT LEVEL

A178872
  1. Check that the engine coolant level is between the L and F lines when the engine is cold.
    If the engine coolant is low, check for leaks and add "TOYOTA Super Long Life Coolant" or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite and non-borate coolant with long-life hybrid organic acid technology to the F line.

    NOTICE:
    Do not substitute plain water for engine coolant.

  1. Remove the radiator cap, and check that the coolant level is up to the radiator filler hole.

← REMOVAL (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →