INSTALLATION
Removal / installation · Vehicles built Sep 2011 – Dec 2011
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
| 1.
INSTALL PURGE VSV |
 |
- Install the purge VSV with the bolt.
-
Torque:
- 9.0 N*m{
92 kgf*cm
, 80 in.*lbf
}
- Connect the 2 purge line hoses.
Connect the purge VSV connector.
| 2.
INSTALL V-BANK COVER
|
 |
- Install the V-bank cover with the 2 nuts.
-
Torque:
- 7.5 N*m{
76 kgf*cm
, 66 in.*lbf
}
| 3.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
 |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).