2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL PURGE VSV
  1. Install the purge VSV with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 2 purge line hoses.

  1. Connect the purge VSV connector.


2. INSTALL V-BANK COVER

  1. A271365E01
    Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
    Text in Illustration 
    *1
    Pin
    *2
    Hook

← INSTALLATION (Sep 2011 – Dec 2011)INSPECTION (from Sep 2011) →