2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012


1. REMOVE V-BANK COVER

  1. A267633E01
    Raise the front of the V-bank cover to detach the 2 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
    Text in Illustration 
    *1
    Pin
    *2
    Hook


2. REMOVE AIR CLEANER CAP AND HOSE

  1. A273474
    Remove the air cleaner cap and hose.

    1. Disconnect the mass air flow meter connector, vacuum hose and ventilation hose and detach the clamp.

    2. Loosen the clamp.

    3. Unfasten the 4 hook clamps, and then remove the bolt and the air cleaner cap and hose.


3. REMOVE AIR TUBE

  1. A223569
    Remove the 2 bolts, 2 nuts and air tube.

  1. Remove the 2 gaskets.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.


4. REMOVE NO. 1 EMISSION CONTROL VALVE SET

  1. A267738
    Disconnect the No. 1 emission control valve set connector.

  1. Disconnect the No. 1 air hose from the No. 1 emission control valve set.

  1. A223570
    Remove the 3 nuts and No. 1 emission control valve set.

← COMPONENTS (from Jan 2012)INSPECTION (from Jan 2012) →