2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Sep 2011


1. INSTALL PURGE VSV

  1. A158655E02
    Install the purge VSV with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the purge VSV connector.

    Text in Illustration 
    *a
    Upper


2. CONNECT PURGE LINE HOSE
  1. Connect the 2 purge line hoses.

    HINT:
    Turn the claw of the clip to the upper side.


3. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A177597E02
    Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
    Text in Illustration 
    *1
    Bracket
    *2
    Hook
    *3
    Pin
    *4
    Grommet

← INSPECTION (from Sep 2011)INSPECTION (from Sep 2011) →