2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Sep 2011


1. REMOVE V-BANK COVER SUB-ASSEMBLY

  1. A174196E03
    Raise the front of the V-bank cover to detach the 3 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
    Text in Illustration 
    *1
    Bracket
    *2
    Hook
    *3
    Pin
    *4
    Grommet


2. DISCONNECT PURGE LINE HOSE
  1. Disconnect the 2 purge line hoses.


3. REMOVE PURGE VSV

  1. A158599
    Disconnect the purge VSV connector.

  1. Remove the bolt and purge VSV.

← COMPONENTS (from Sep 2011)INSPECTION (from Sep 2011) →