2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL STUD BOLT
  1. Using an E6 "TORX" socket wrench, install the 4 stud bolts to the EGR cooler.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }


2. INSTALL NO. 8 WATER BY-PASS HOSE
  1. Install the 2 No. 8 water by-pass hoses.


3. INSTALL NO. 3 WATER BY-PASS PIPE
  1. Connect the 2 hoses and install the No. 3 water by-pass pipe with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


4. INSTALL NO. 1 AND NO. 2 EGR VALVE ASSEMBLIES
(Click here)
← INSTALLATION (Sep 2011 – Dec 2011)COMPONENTS (from Jan 2012) →