2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL STUD BOLT

  1. A165225
    Using an E6 "TORX" socket wrench, install the 4 stud bolts to the EGR cooler.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }


2. INSTALL NO. 8 WATER BY-PASS HOSE

  1. A165501
    Install the 2 hoses.


3. INSTALL NO. 3 WATER BY-PASS PIPE

  1. A163653
    Connect the 2 hoses and install the water by-pass pipe with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


4. INSTALL NO. 1 AND NO. 2 EGR VALVE ASSEMBLIES
  1. Install the No. 1 and No. 2 EGR valve assemblies (Click here).

← REMOVAL (from Jan 2012)INSTALLATION (from Jan 2012) →