2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. REMOVE RADIATOR ASSEMBLY
(Click here)

2. REMOVE CRANKSHAFT PULLEY SUB-ASSEMBLY

NOTICE:
A181685E02
This procedure is intended for removal/installation of the crankshaft pulley only. Do not use this procedure for removal/installation of the flywheel or the drive plate and ring gear.

Text in Illustration 
*1
Service Hole
*2
Protrusion
  1. Install the 2 bolts to the bolt holes of the crankshaft rear side.

  1. Using a bar, turn the crankshaft until the crankshaft pulley service hole is a little to the left of bottom dead center.

  1. Install a 14 mm x 1.5 pitch service bolt with a length of 70 mm or more to the crankshaft pulley service hole, and hold the crankshaft using the timing chain cover protrusion.

  1. Remove the 3 bolts and crankshaft pulley.

    NOTICE:
    If the crankshaft pulley cannot be removed, temporarily install a bolt to the crankshaft so that the pulley does not fall, and lightly tap the outer edge of the mass damper with a plastic-faced hammer to remove the pulley. Do not tap the pulley V-ribbed belt ribs, as the crankshaft may be damaged.


3. REMOVE FRONT CRANKSHAFT OIL SEAL

  1. A179096E02
    Using a knife, cut off the lip of the oil seal.
    Text in Illustration 
    *1
    Cut Position
    *2
    Front Crankshaft Oil Seal

  1. Using a screwdriver, pry out the oil seal.

    NOTICE:
    Be careful not to damage the crankshaft.

    HINT:
    Tape the screwdriver tip before use.

← REMOVAL (Sep 2011 – Dec 2011)INSTALLATION (Sep 2011 – Dec 2011) →