2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012


1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)
  1. Apply a light coat of engine oil to a new O-ring.

  1. Install the O-ring to the camshaft timing oil control valve.

  1. Install the camshaft timing oil control valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the camshaft timing oil control valve connector.


2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)
  1. Apply a light coat of engine oil to a new O-ring.

  1. Install the O-ring to the camshaft timing oil control valve.

  1. Install the camshaft timing oil control valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the camshaft timing oil control valve connector.

  1. w/ Secondary Air Injection System:

    1. Connect the air pipe with the bolt.

      Torque:
      10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    2. Attach the clamp and connect the throttle body connector.


3. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)
  1. Apply a light coat of engine oil to a new O-ring.

  1. Install the O-ring to the camshaft timing oil control valve.

  1. Install the camshaft timing oil control valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the camshaft timing oil control valve connector.


4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)
  1. Apply a light coat of engine oil to a new O-ring.

  1. Install the O-ring to the camshaft timing oil control valve.

  1. Install the camshaft timing oil control valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the camshaft timing oil control valve connector.


5. INSTALL AIR CLEANER CAP AND HOSE
  1. Install the air cleaner cap and hose, and then tighten the hose clamp.

    Torque:
    2.5 N*m{ 25 kgf*cm , 22 in.*lbf }

  1. Attach the 4 clamps.

  1. Connect the mass air flow meter connector and attach the clamp.

  1. Connect the No. 2 PCV hose and No. 1 air hose.


6. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A274416E01
    Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
    Text in Illustration 
    *1
    Grommet
    *2
    Pin
    *3
    Hook
    *4
    Bracket

← INSPECTION (from Jan 2012)COMPONENTS (from Jan 2012) →