2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Sep 2011


1. REMOVE V-BANK COVER SUB-ASSEMBLY

  1. A174196E03
    Raise the front of the V-bank cover to detach the 3 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
    Text in Illustration 
    *1
    Bracket
    *2
    Hook
    *3
    Pin
    *4
    Grommet


2. REMOVE AIR CLEANER HOSE ASSEMBLY

  1. A243375
    Disconnect the vacuum hose and No. 2 ventilation hose.

  1. Loosen the 2 hose clamps.

  1. Remove the air cleaner hose.


3. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)

A163109
  1. Disconnect the oil control valve connector.

  1. Remove the bolt and oil control valve.

  1. Remove the O-ring from the oil control valve.


4. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)

A163110
  1. Disconnect the oil control valve connector.

  1. Remove the bolt and oil control valve.

  1. Remove the O-ring from the oil control valve.


5. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)

A163111
  1. Disconnect the oil control valve connector.

  1. Remove the bolt and oil control valve.

  1. Remove the O-ring from the oil control valve.


6. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)

A163112
  1. Disconnect the oil control valve connector.

  1. Remove the bolt and oil control valve.

  1. Remove the O-ring from the oil control valve.

← ON-VEHICLE INSPECTION (from Sep 2011)INSPECTION (from Sep 2011) →