2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012


1. REMOVE V-BANK COVER SUB-ASSEMBLY

  1. A274415E01
    Raise the front of the V-bank cover to detach the 3 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
    Text in Illustration 
    *1
    Grommet
    *2
    Pin
    *3
    Hook
    *4
    Bracket


2. REMOVE AIR CLEANER CAP AND HOSE

  1. A272589
    Disconnect the No. 2 PCV hose and No. 1 air hose.

  1. Disconnect the mass air flow meter connector and detach the clamp.

  1. Detach the 4 clamps.

  1. Loosen the hose clamp and remove the air cleaner cap and hose.


3. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 1)

  1. A215418
    Disconnect the camshaft timing oil control valve connector.

  1. Remove the bolt and camshaft timing oil control valve.

  1. Remove the O-ring from the camshaft timing oil control valve.


4. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 1)

  1. A215419
    Disconnect the camshaft timing oil control valve connector.

  1. Remove the bolt and camshaft timing oil control valve.

  1. Remove the O-ring from the camshaft timing oil control valve.


5. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Intake Side of Bank 2)

  1. w/ Secondary Air Injection System:

    1. A218668
      Disconnect the throttle body connector and detach the clamp.

    2. A218669
      Remove the hose clamp, bolt and air pipe.

  1. A218670
    Disconnect the camshaft timing oil control valve connector.

  1. Remove the bolt and camshaft timing oil control valve.

  1. Remove the O-ring from the camshaft timing oil control valve.


6. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Exhaust Side of Bank 2)

  1. A218671
    Disconnect the camshaft timing oil control valve connector.

  1. Remove the bolt and camshaft timing oil control valve.

  1. Remove the O-ring from the camshaft timing oil control valve.

← ON-VEHICLE INSPECTION (from Jan 2012)INSPECTION (from Jan 2012) →