2011-2013 Land Cruiser · Service Manual Vehicle Exterior

REASSEMBLY

Removal / installation · Vehicles built from Sep 2011


1. INSTALL WINCH MOTOR BRUSH SPRING

  1. B187368
    Install the brush spring as shown in the illustration.


2. INSTALL NO. 1 WINCH MOTOR ARMATURE BEARING

  1. B180527E01
    Using a 12 mm socket wrench and press, press in a new bearing.


3. INSTALL NO. 2 WINCH MOTOR ARMATURE BEARING

  1. B184649E01
    Using a 19 mm socket wrench and press, press in a new bearing.


4. INSTALL WINCH MOTOR ARMATURE SUB-ASSEMBLY

  1. B184479
    Apply high temperature grease to the inside of the end frame bushing.

  1. Install the armature to the end frame.


5. INSTALL WINCH MOTOR YOKE SUB-ASSEMBLY

  1. B180529
    Align the alignment marks and install the yoke to the end frame.


6. INSTALL WINCH MOTOR BRUSH HOLDER ASSEMBLY

  1. B180530
    Align the alignment marks and install the brush holder to the yoke.


7. INSTALL WINCH MOTOR BRUSH

  1. B180514
    Install the brush with the bolt.

    Torque:
    3.4 N*m{ 35 kgf*cm , 30 in.*lbf }

  1. B180513
    Using a screwdriver, pry the brush spring forward and insert the brush into the holder as shown in the illustration, then remove the screwdriver from the spring.

    HINT:
    Use the same procedures to install the 3 remaining brushes.


8. INSTALL WINCH MOTOR O-RING
  1. Install a new O-ring to the yoke.


9. INSTALL WINCH MOTOR COMMUTATOR END FRAME

  1. B180512
    Install the end frame with the 2 bolts.

    Torque:
    7.7 N*m{ 79 kgf*cm , 69 in.*lbf }


10. INSTALL WINCH MOTOR MAGNET SWITCH ASSEMBLY

  1. B180510
    Install the switch to the motor with the 4 bolts.

    Torque:
    4.9 N*m{ 50 kgf*cm , 43 in.*lbf }

  1. B180509
    Install the wire harness with the 2 washers, 2 spring washers and 2 nuts.

    Torque:
    9.3 N*m{ 95 kgf*cm , 82 in.*lbf }

  1. Connect the connector.


11. INSTALL MAGNET SWITCH WINCH COVER

  1. B180508
    Install the cover with the 4 screws.

    Torque:
    1.5 N*m{ 15 kgf*cm , 13 in.*lbf }


12. INSTALL WINCH ROLLER BRACKET ASSEMBLY

  1. B188407E01
    Install the roller bracket with the 4 bolts and 2 nuts.

    Torque:
    for bolt A:
    21.6 N*m{ 220 kgf*cm , 15 ft.*lbf }
    for bolt B:
    28.4 N*m{ 289 kgf*cm , 20 ft.*lbf }


13. INSTALL NO. 2 WINCH EARTH WIRE

  1. B188298
    Install the winch earth wire with the bolt.

    Torque:
    17.5 N*m{ 178 kgf*cm , 12 ft.*lbf }


14. INSTALL WINCH MOTOR ASSEMBLY

B167951
  1. Install the winch motor with the 3 bolts.

    Torque:
    15.7 N*m{ 160 kgf*cm , 11 ft.*lbf }

  1. B180488E01
    Install the winch base with the 8 bolts.

    Torque:
    for bolt A:
    32.3 N*m{ 329 kgf*cm , 23 ft.*lbf }
    for bolt B:
    58.8 N*m{ 599 kgf*cm , 43 ft.*lbf }

  1. B180487
    Install the member with the 4 bolts.

    Torque:
    21.6 N*m{ 220 kgf*cm , 15 ft.*lbf }

← INSPECTION (from Sep 2011)INSTALLATION (Sep 2011 – Dec 2011) →