2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012


1. PRECAUTION

NOTICE:
After turning the engine switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work (Click here).


2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


3. DISCONNECT CONNECTOR HOLDER BLOCK

  1. A183089E02
    Remove the 3 bolts and move the connector holder block so that the ECM can be removed in the next step.
    Text in Illustration 
    *A
    for LHD
    *B
    for RHD


4. REMOVE ECM

  1. A182753E03
    Raise the 2 levers while pushing the locks on the 2 levers.
    Text in Illustration 
    *1
    Lock
    *a
    Push

    NOTICE:
    Make sure that the lock levers are raised 90° as shown in the illustration before disconnecting the ECM connectors. Failure to do this may cause the ECM connectors to break.

  1. Disconnect the 2 connectors.

  1. A155993
    Remove the 4 bolts and ECM.


5. REMOVE GASKET

  1. A167150
    Peel off the gasket.

  1. A185949E02
    Spray gasket remover or equivalent on the remaining tape of the gasket.
    Text in Illustration 
    *1
    Cloth

    NOTICE:
    When using gasket remover or equivalent, cover the ECM connectors with a cloth.

  1. A163829
    Remove the tape of the gasket without using bladed objects.

← COMPONENTS (from Jan 2012)INSTALLATION (from Jan 2012) →