2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REASSEMBLY

Removal / installation · Vehicles built from Jan 2012


1. INSTALL OIL PUMP RELIEF VALVE
  1. Coat the oil pump relief valve with engine oil.

  1. Install the relief valve and valve spring into the oil pump cover hole.

  1. Install a new gasket and the plug.

    Torque:
    37 N*m{ 375 kgf*cm , 27 ft.*lbf }

← INSPECTION (from Jan 2012)INSTALLATION (from Jan 2012) →