INSTALLATION
Removal / installation · Vehicles built Sep 2011 – Dec 2011
| 1. INSTALL AIR PUMP ASSEMBLY |
Install the air pump, 3 insulators and 3 collars with the 3 bolts.

- Torque:
- 10 N*m{ 102 kgf*cm , 7 ft.*lbf }
Install the air hose.
| 2. INSTALL NO. 1 AIR INJECTION SYSTEM HOSE |
Install the hose to the air pump assembly.
| 3. INSTALL AIR SWITCHING VALVE ASSEMBLY |
Install the air switching valve to the No. 1 air injection system hose.

Install the air switching valve to the air pump bracket with the 2 bolts.
- Torque:
- 16 N*m{ 163 kgf*cm , 12 ft.*lbf }
Install the air pressure sensor to the air switching valve with the 2 bolts.

- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Install the vacuum hose to the air pressure sensor and air switching valve.
Connect the air pressure sensor connector.
Connect the air switching valve connector.
| 4. INSTALL AIR PUMP WITH BRACKET AND AIR SWITCHING VALVE |
Install the air pump with bracket with the 2 bolts and 2 nuts in the order shown in the illustration.

- Torque:
- 16 N*m{ 163 kgf*cm , 12 ft.*lbf }
Connect the pressure sensor connector.
Connect the air switching valve connector.
| 5. INSTALL NO. 2 AIR INJECTION SYSTEM HOSE |
Install the hose.

| 6. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY |
Apply soapy water to the O-ring.
Install a new O-ring to the water by-pass pipe.
Push in the water by-pass pipe.

Install the water by-pass pipe with the bolt.
- Torque:
- 18 N*m{ 184 kgf*cm , 13 ft.*lbf }
Connect the 2 vacuum switching valve hoses to the water by-pass pipe clamp.
Connect the wire harness clamp.
Connect the connector.
| 7. INSTALL INTAKE MANIFOLD |
Install the intake manifold (Click here).
