2011-2013 Land Cruiser · Service Manual Vehicle Exterior

INSTALLATION

Removal / installation · Vehicles built from Sep 2011

HINT:
  1. Use the same procedures for the RH side and LH side.
  2. The procedures listed below are for the LH side.
  3. When installing the clip, heat the vehicle body and clip using a heat light.

    Standard Heating Temperature:
    Item
    Temperature
    Vehicle Body
    40 to 60°C (104 to 140°F)
    Clip
    20 to 30°C (68 to 86°F)

NOTICE:
Do not heat the vehicle body and clip excessively.


1. INSTALL NO. 2 ROOF DRIP SIDE FINISH MOULDING RETAINER (w/ Roof Carrier)

B181085
  1. Install the retainer with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


2. INSTALL ROOF RACK BRACKET

B181078
  1. w/o Roof Carrier:
    Install the 4 brackets with the 8 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. w/ Roof Carrier:
    Install the bracket with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


3. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP

HINT:
Perform the following procedures when replacing the No. 1 roof drip side finish moulding clip.

NOTICE:
Remove the double-sided tape where the clips will be installed on the body and clean the body with a non-residue type solvent.

  1. B187426E01
    Apply a 2 to 3 mm (0.0788 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to a new No. 1 roof drip side finish moulding clip.

    HINT:
    Adhesive strength (tensile strength): 13.7 MPa (140 kgf/cm2, 1991 psi) or more when the temperature is 23°C (73°F).

  1. Apply primer to the body where the No. 1 roof drip side finish moulding clip will be installed.

    NOTICE:
    Do not let the primer dry.

  1. B181079E01
    While using the position shown in the illustration as a reference, place the No. 1 roof drip side finish moulding clip onto the roof panel. Then position and install the clip after lightly pressing against it so that the adhesive adheres to the primer.

  1. Install the rear roof drip side finish moulding when 40 minutes or more have elapsed after pressing and installing the No. 1 roof drip side finish moulding clip.

    HINT:
    1. Initial hardening time: 40 minutes
    2. Complete hardening time: 48 hours


4. INSTALL REAR ROOF DRIP SIDE FINISH MOULDING LH

B181083
  1. Attach the clip to install the moulding.


5. INSTALL CENTER ROOF DRIP SIDE FINISH MOULDING LH

B181082

HINT:
Use the same procedure to install the moulding on the other side.

  1. Install the moulding as shown in the illustration.


6. INSTALL ROOF DRIP SIDE FINISH MOULDING LH

B181081

HINT:
Use the same procedure to install the moulding on the other side.

  1. Install the moulding as shown in the illustration.


7. INSTALL ROOF DRIP SIDE FINISH MOULDING JOINT COVER LH

B181080
  1. w/o Roof Carrier:
    Attach the claws and clips to install the 4 covers.

  1. w/ Roof Carrier:
    Attach the claw and clip to install the cover.


8. INSTALL ROOF RACK ASSEMBLY (w/ Roof Rack)
  1. Install the roof rack assembly (Click here).


9. INSTALL ROOF CARRIER ASSEMBLY LH (w/ Roof Carrier)
  1. Install the roof carrier assembly LH (Click here).

← REMOVAL (from Sep 2011)COMPONENTS (from Sep 2011) →