2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012


1. INSTALL PURGE VSV
  1. Install the purge VSV with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 purge line hoses.

  1. Connect the purge VSV connector.


2. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A274416E01
    Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.
    Text in Illustration 
    *1
    Grommet
    *2
    Pin
    *3
    Hook
    *4
    Bracket

← INSPECTION (from Jan 2012)INSPECTION (from Jan 2012) →