INSTALLATION
Removal / installation · Vehicles built from Jan 2012
| 1. INSTALL ENGINE OIL LEVEL SENSOR |
Install a new gasket to the engine oil level sensor.
Install the engine oil level sensor with the 4 bolts.
- Torque:
- 7.0 N*m{ 71 kgf*cm , 62 in.*lbf }
Connect the connector.
| 2. CONNECT OIL COOLER TUBE |
Connect the oil cooler tube with the 2 bolts.
- Torque:
- 14 N*m{ 143 kgf*cm , 10 ft.*lbf }
| 3. ADD ENGINE OIL |
Add fresh oil and install the oil filler cap.
- Standard Oil Grade:
Oil Grade
Oil Viscosity (SAE)
API grade SL "energy-conserving", SM "energy-conserving", SN "resource-conserving" or ILSAC multigrade engine oil
0W-20
5W-20
5W-30
10W-30
API grade SL, SM or SN multigrade engine oil
15W-40
20W-50
- Standard Oil Capacity:
Item
Specified Condition
Drain and refill without oil filter change
7.1 liters (7.5 US qts, 6.2 Imp. qts)
Drain and refill with oil filter change
7.5 liters (7.9 US qts, 6.6 Imp. qts)
Dry fill
9.3 liters (9.8 US qts, 8.2 Imp. qts)
| 4. INSPECT ENGINE OIL LEVEL |
Warm up the engine, stop the engine and wait 5 minutes. The oil level should be between the dipstick low level mark and full level mark.
If low, check for leakage and add oil up to the full level mark.- NOTICE:
- Do not fill engine oil above the full level mark.
| 5. INSPECT FOR OIL LEAK |
Start the engine. Make sure that there are no oil leaks from the area that was worked on.
| 6. INSTALL NO. 2 ENGINE UNDER COVER |
Install the No. 2 engine under cover with the 2 bolts.
- Torque:
- 29 N*m{ 296 kgf*cm , 21 ft.*lbf }
| 7. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY |
Remove the 10 bolts and No. 1 engine under cover sub-assembly.

| 8. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH |
Push in the clip to install the front fender splash shield sub-assembly LH.
Install the 3 bolts and screw.
| 9. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH |
Push in the clip to install the front fender splash shield sub-assembly RH.
Install the 3 bolts and 2 screws.
